1. Question Content...


Question List

Question1: There are four inputs to the plan business analysis activities. Which one of the following is not an input to the plan business analysis activities process?

Question2: You are the business analyst for your organization and you are preparing the business case for a proposed solution. You need to include the management horizon in your business case. What is the management horizon?

Question3: Which conduct stakeholder analysis technique identifies stakeholder roles that may serve as a useful starting point for identifying actors and roles?

Question4: The creative thinking process has three values to determine the effectiveness of the process.
Which one of the following is not a measurement of effective creative thinking?

Question5: While defining what necessary conditions are required to achieve the business need for a highly regulated government client, a business analyst (BA) discovers that some legacy policies will either constrain or are insufficient to achieve value desired by the future state.
How should the BA proceed?

Question6: An insurance company wants to increase sales by 15% and customer retention by 10% within 1 calendar year.
Various strategies to achieve this were considered and a restructure to the existing pricing model is selected to help achieve these goals.
A business analyst (BA) works with stakeholders such as actuaries, product specialists, sales staff, risk managers, and underwriters who agree to applying varying levels of discounts to customers based on:
*Total annual premium the customer has with the company (Financial worth)
*Time with the insurance company (Loyalty)
Various financial models are considered but the stakeholders agree that an initial applicable discount is determined based on the customer's overall premium:

The percentage of the maximum possible discount available to the customer is adjusted based on time with the company:

As the new pricing structure was being implemented, the chief executive officer (CEO) of the company wanted to change the premiums and associated discounts offered to customers. The BA investigated the cost, anticipated benefits and the length of time the change would likely take to complete before presenting the results back to the CEO.
What type of analysis has the BA just conducted?

Question7: When does the lessons learned document is updated?

Question8: The business analysis approach generally defines all of the following attributes except for which one?

Question9: A company wants to launch an existing product in another channel and the business analyst (BA) is starting to perform the stakeholder analysis.

Legend: Influence/Impact 1 to 5 (1 = very limited impact/influence: 5 = very high impact/influence).
Considering the analysis, what values for influence and impact will the BA assign to the marketing?

Question10: You are the business analyst for your organization. On your current project you'll be using the change-driven approach for defining requirements and gathering feedback.
Which of the following statements best describes the change-driven approach?

Question11: A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.
The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.
A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

Each truck can only make two trips a day. The BA has noticed that only 30% of trips have their orders available for loading when a truck arrives. Otherwise the truck has to wait one extra hour until the orders are picked and brought to the loading bay.
If trucks are the only constraint, approximately how many hours are lost due to this downtime?

Question12: You are the business analyst for your organization and are leading a presentation about an identified problem. This presentation will help the stakeholders to understand the problem and it will help you when you begin to elicit requirements from the stakeholders.
Which type of learner learns best through the presentation of models?

Question13: A Business Analyst (BA) is tasked with presenting the requirements for an auto insurance product to domain and implementation subject matter experts (SMEs). What requirements viewpoints should be used by the BA?

Question14: Marcy is the business analyst for her organization. She is completing the business analysis task of defining the business needs. She has the business goals and objectives and the requirements stated documentation. What must she confirm about the requirements stated documentation before defining the business need based on her analysis?

Question15: You are the business analyst for your organization and you are completing the verify requirements process.
There are eight characteristics each requirement should have: cohesive, complete, consistent, correct, and feasible.
Which one of the following four is not a characteristic of a requirement?

Question16: In a software implementation project, the designated business analyst (BA) has conducted all the elicitation activities and now needs to confirm the elicitation results.
What is used by the BA Professional to guide which sources of information and which results are to be compared?

Question17: Which one of the following statements best describes requirements prioritization?

Question18: Your organization is trying to determine which one of two opportunities they will pursue.
The Project A is worth $235,987 and Project B is worth $567,000 but carries significant risk.
The organization elects to purse Project B and not Project A.
What is the opportunity cost in this scenario?

Question19: You are the business analyst for THY Organization and you have gathered the requirements. You have presented the requirements to the stakeholders and they have approved your requirements.
You are now working with Francie on recording the dependencies and relationships for each of the requirements.
Why would you want to record the dependencies and relationships for the requirements?

Question20: A company wants to launch an existing product in another channel and the business analyst (BA) is starting to perform the stakeholder analysis.

Legend: Influence/Impact 1 to 5 (1 = very limited impact/influence: 5 = very high impact/influence).
Considering the analysis, what values for influence and impact will the BA assign to the marketing?

Question21: A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.
The BA has collected the following information over the last three months pertaining to these business processes:
*All the business processes are at their maximum capacity in terms of the current number of transactions.
*Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.
The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

Assuming the BA's recommendation to be true, what will be the new success rate of the mortgage closure process?

Question22: Which one of the following is an example of a non-negotiable demand by a stakeholder during the requirements prioritization session?

Question23: An insurance company has two actuarial teams: Life and Non-Life. The Life team has a specialized tool to make their calculations while the Non-life team performs calculations manually. Last year the company bought a single solution to support both groups. The Non-Life team continues to do certain calculations manually to conform to their processes.
Which type of analysis was missed prior to purchasing a solution?

Question24: You are the business analyst for the YGT Organization. You have just completed a capabilities gap assessment and have determined that your organization does not have the necessary resources and technology to seize a business opportunity. What is the most likely course of action for the organization?

Question25: What element of the conduct elicitation activity is tracked to provide a basis for future planning?

Question26: Which of the following participants have to keep the minutes and details of the conversation during Interviews?

Question27: A software company has won a contract to implement its product for a client. As part of the implementation work, a business analyst (BA) is asked to elicit information about the other client applications that will interface with the new system and provide the information graphically. The technical staff needs to understand the message interaction within the systems for key business transactions.
Which type of diagram should the BA use?

Question28: All of the following are examples of transference risk response except for which one?

Question29: You are the business analyst for a large project in your organization. You are working with Ben to create requirements packages to present to the stakeholders, the business analyst team, and to the project manager.
Ben wants to know why you're creating requirements packages.
What's the primary goal of developing a requirements package?

Question30: A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.
The BA has collected the following information over the last three months pertaining to these business processes:
*All the business processes are at their maximum capacity in terms of the current number of transactions.
*Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.
The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

If the financial institution always works at full capacity month to month and the new success rate continues to remain the same after implementing the BA's recommendation, what is the average number of successes per month for the mortgage closure process, if the current process capability were increased by 50%?

Question31: What portion of the communications model could be defined as the translator?

Question32: A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.
The BA has collected the following information over the last three months pertaining to these business processes:
*All the business processes are at their maximum capacity in terms of the current number of transactions.
*Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.
The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

Which of the following business processes can be identified for the process improvement initiative?

Question33: Sally is the business analyst for her organization. Sally and her business analysis team is currently using a business analysis approach to determine what the competition of her organization is offering prospective clients. She is trying to identify solutions to increase revenue by remaining competitive with the competition.
What business analysis approach is Sally and her business analysis team using?

Question34: Which of the following types of elicitation allows each stakeholder to freely discuss their role in a particular process?

Question35: Which of the following charts is a quality control tool to show categories of defects?

Question36: Which of the following can be an effective tool during quality control to help determine the how the problem occurred?

Question37: A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:
Ability to integrate online maps and global positioning system (GPS) technology with the mobile application in real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.
II. Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.
III. Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.
Through requirements workshops the business analyst elicits the following detailed business requirements:
1. The company's mobile application platform must support real time integration with the following third party systems:
A ) GPS System
B ) Postal Code Validation
2. The service providers available for selection must participate in the subscriber's medical plan network as of the current system date.
3. The map display shall highlight the boundary of the search area with a dotted yellow line.
4. The extent and shape of the search area shall be determined based on one of the following user choices:
A ) Postal code - Subscriber location acquired from GPS shall be used to determine and populate the related postal code as the default postal code with options for the user to change the postal code.
B ) Radius for the search area around the subscriber's location, that will have default value of 5 miles. The radius can be changed by the subscriber with a maximum range of 50 miles.
5. Subscriber shall be able to select one of the options above and supply corresponding input.
6. System shall validate the user input and display appropriate error messages if invalid.
7. Based on the inputs and the plan of the subscriber, the system shall retrieve information for the participating service providers that are located within the designated search area.
8. System shall display a map including visual markers to indicate locations of the service providers in the top half of the device screen and a list of the same service providers in the bottom half of the device screen.
9. The list of service providers shall include the Name, Phone Number and Street Address.
10. If the subscriber specified the radius or retained the default postal code for the search area, the list shall additionally include the approximate driving distance in miles from the subscriber's last registered location and the list shall be sorted in the ascending order of the driving distance.
11. The subscriber shall be able to select a service provider either from the list or from the map and download a document that contains the name, contact telephone, email address, fax number and the fee schedule for the covered services applicable to the subscriber's plan.
Which of the following relationship types correctly identifies the nature of the relationship between the 3 business capabilities and the 11 requirements?

Question38: You are the business analyst for your organization. You are identifying new opportunities to improve upon your existing web services. Management is open to new opportunities as long as the changes do not take more than 60 days to implement. What type of a factor does the 60 day implementation represent?

Question39: You are the business analyst for your organization and are preparing for the conduct elicitation activity. You'll need several stakeholders' roles as you prepare for this activity in your organization.
Which one of the following stakeholders may be responsible to dictate that a specific process or technique be followed during your requirements elicitation activities?

Question40: You are the business analyst for your organization. Management has asked you to create a plan that will define the proposed structure and schedule for communicating the business analysis activities to the appropriate stakeholders. What plan does management want you to create?

Question41: You are hosting a collection of stakeholders from across the organization to identify the ideas and attitudes about your company's help desk. You want the stakeholders to honestly share their opinions about the help desk service so you can identify problems, solutions, and take actions to improve the service.
What type of requirements elicitation activity is this?

Question42: When is stakeholder analysis performed?

Question43: Which of the following is a method of displaying the timelines of all the various subtasks that are involved in any project?

Question44: You are the business analyst for your organization. Management has asked that in the business case you're creating that you also include the projected costs and benefits to be realized and how those and benefits will be assessed and evaluated. What term matches management's request?

Question45: You are the business analyst for a large project in your organization. You are working with Ben to create requirements packages to present to the stakeholders, the business analyst team, and to the project manager.
Ben wants to know why you're creating requirements packages. What's the primary goal of developing a requirements package?

Question46: Most users of a pilot application have experienced more efficient processing compared to the old system.
However, the business analyst (BA) has observed that a few people took much longer to complete the process.
The system event log shows that those users encountered errors when they attempted to sign on.
Which of the following would the BA recommend to improve overall performance?

Question47: Which of the following qualitative techniques involves a disciplined analysis of the event sequences that could transform a potential hazard into an accident?

Question48: Which of the following phases is the first step towards creating a business continuity plan?

Question49: You are the business analyst for your organization and are working on a solution that will connect several databases to a web application. You are concerned that the databases may not be operable with the software solution a programmer is recommending. What requirements elicitation technique can help you determine the interoperability of the software, the databases, and the web application?

Question50: You are coaching Marcy, a new business analyst for your organization, on business analysis processes. Marcy is concerned about the define solution scope process, especially the implementation approach element. Which of the following statements best defines the implementation approach element for Marcy?

Question51: You are the business analyst for your organization. You are identifying new opportunities to improve upon your existing web services. Management is open to new opportunities as long as the changes do not take more than 60 days to implement.
What type of a factor does the 60 day implementation represent?

Question52: Which of the following directs the improvement efforts to those areas that will have the biggest impact?

Question53: What does the T in SWOT analysis mean?

Question54: Which of the following stages of a project defines the number of risks and opportunities, including intense planning and anticipation of risk events?

Question55: You are the business analyst for your organization. You are currently identifying opportunities for a customer to improve their business processes. The customer wants to streamline their business efforts either through new technologies, better processes, or a combination of both. The customer demands, however, that the solution should not cost more than $300,000 to implement and support for one year.
What does the $300,000 represent?

Question56: You are the business analyst for a large project for your organization. Your project has 65 stakeholders and this will greatly increase the complexity of the communication in this project. To demonstrate how complex this project and its communication will be, you show the management the number of communication channels in this project. How many channels exist in this project based on the number of stakeholders?

Question57: The business process model is also known as .

Question58: A software company has won a contract to implement its product for a client. As part of the implementation work, a business analyst (BA) is asked to elicit information about the other client applications that will interface with the new system and provide the information graphically. The technical staff needs to understand the message interaction within the systems for key business transactions.
Which type of diagram should the BA use?

Question59: You are the business analyst for your organization and are preparing for the conduct elicitation activities. You'll have six inputs as you prepare for this activity.
Which one of the following is not a valid input for the requirements elicitation activity?

Question60: Mark is the business analyst for his organization. He is working with the solution development team and he believes that the team does not want to implement a certain portion of the requirements. The team is expressing the difficulty of the requirements and how it will be extremely challenging to complete. When Mark asks about a similar project that the team completed, they insist that this is a different type of requirements though Mark believes that it is not. What is the solution development team appearing to do to the requirements?

Question61: Enterprise analysis creates just five outputs. Which one of the following is an output of the enterprise analysis tasks?

Question62: As a milestone is reached, the project is funded for enough capital to reach the next milestone. This approach is called .

Question63: An insurance company wants to implement a business intelligence solution to consolidate data from various different internal system to provide a better understanding of their customer base.
A business analysis (BA) is engaged to put together a tender (bid) to be sent to various business intelligence providers and implemention partners. Among other information the business analysis request the following:
* Licensing costs for year 0 based on needing 1 Central processing Unit (CPU) license
* Licensing costs for specific user types such as Report Creators Online Analytical Process (OLAO) user and Power users
* Predicted licensing costs for renewing in Years 1 and 2
* Full implementation costs
After reviewing the received vendor responses the project team shortlists the candidates to 3 and the BA structures the received information as follows:

The Insurance company has a maximum bucket of $310,000 for the entire to implementation and operation over the first three years. Which vendor or vendors meet that criteria?

Question64: Which of the following types of elicitation allows each stakeholder to freely discuss their role in a particular process?

Question65: Which of the following is concerned with determining whether the information used for risk analysis is probable, of high class, or accurate?

Question66: Which of the following is NOT a component of an entity relationship diagram?

Question67: Which of the following is a flowchart that shows all the processes and the interfaces that interact with the project processes?

Question68: An insurance company wants to implement a business intelligence solution to consolidate data from various different internal systems to provide a better understanding of their customer base.
A business analyst (BA) is engaged to put together a tender (bid) to be sent to various business intelligence providers and implementation partners. Among other information, the business analyst requests the following:
* Licensing costs for Year 0 based on meeting 1 Central Processing Unit (CPU) license
* Licensing costs for specific user types such as Report Creators. Online Analytical Processing (OLAP) users and Power uses Predicted licensing costs for renewing in Years 1 ad 2
* Full implementation costs
After reviewing the received vendor responses the project team shortlists the candidates to 3 and the BA structures the received information as follows:

The BA also conducts a sensitivity analysis to compare the expected costs should the company's needs grow based on the following information:
Scenario 1: Ten extra report creator, 1 extra OLAP user and 1 extra power user licenses and 2 extra CPU licenses Scenario 2: Twenty five extra report creator, 1 extra OLAP user and 1 extra power user licenses and 3 extra CPU licenses

The insurance company has a maximum budget of $810,000 for the entire implementation and operation over the first three years. Which vendor or vendors meet that criteria?

Question69: You are completing enterprise analysis. Management has asked you to create a document that will help them create a go/no go decision to invest and more forward with a proposed project. What document does management want you to create?

Question70: Which of the following is a quality control chart to track trends in project execution?

Question71: You are the business analyst for your organization. You want to use a requirements elicitation technique to produce a broad set of options for an identified problem. You want the stakeholders to help you identify options, factors that affect the solution, any possible delays in the solution implementation, and ideas for creating a solution. Which of the following requirements elicitation activities would best satisfy these requirements?

Question72: You are the business analyst for your organization and are about to conduct requirements elicitation for a process to streamline the customer fulfillment system your organization uses. You need to understand how the people, processes, and technology within the customer fulfillment system operates before you begin the elicitation process.
What type of analytical thinking are you participating in this scenario?

Question73: A business analyst (BA) works for a financial institution that wants to acquire new systems and migrate all future business operations to the new systems. The BA is responsible for performing a gap analysis and has reviewed the current state of systems.
What is the next task that the BA needs to do to complete the gap analysis?

Question74: A solution implemented three months ago has decreased performance as the volume of transactions has increased. A business analyst (BA) is tasked with analyzing the performance of the application and providing recommendations.
What actions does the BA need to take?

Question75: A bank moves currency from the main office to the branches daily for operational use. To avoid paying overnight interest, the branches return the currency at the end of the business day. The bank requires a new inventory management system to account for the whereabouts of the cash at all times. A software provider has proposed a heavily customized version of their standard inventory management software. As the project progresses, the business analyst (BA) identifies a number of subtleties that would suggest a fully made to order solution may be a better option for the bank. What inputs does the BA need to perform the analysis?

Question76: Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.
The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

While verifying the requirements, the BA notices that Requirement ID NFO0003 does not meet the "unambiguous" or the "testable" characteristics of requirements quality. The BA plans to re-write the requirement.
Which of the following requirements is both unambiguous and testable?

Question77: A business analyst (BA) is outlining who should participate in an upcoming requirements elicitation meeting.
From whom should the BA obtain approval before selecting the participants?

Question78: Which of the following is a conversation between one or more speakers centering on one specific topic?

Question79: Which of the following defines how the project will be estimated, budgeted, and how changes to cost will be managed?

Question80: Which solution scope technique can help the business analyst understand the scope of the work by breaking down the scope into smaller work products?

Question81: Before the start of a large, cross functional change effort the team of Business analysts (BAs) assigned decided they need something to help them ensure requirements collectively support one another and do not conflict. What option would provide the consistency they are looking for?

Question82: A new project has to implement a cyber security release in China, Italy, Germany, the United States, and Canada. The project is a $5 million initiative and must 'go live' in production in all countries on the same day and time to be effective.
Which of the approaches mentioned is suitable for this project based on the size and complexity?

Question83: A business analyst (BA) has engaged various groups from across the organization to define the business opportunity a potential project will address. The BA must consolidate the information collected from the groups.
The BA should ensure the business needs .

Question84: You are the business analyst for your organization and you are completing the manage requirements traceability process. You are tracking the requirements to determine how the requirements are interrelated with one another and with the actual delivery of the project scope.
There are actually three reasons why the business analyst should trace requirements. Which one of the following is not one of the three reasons why trace requirements is useful?

Question85: You are the business analyst for your organization. You are currently writing the business goals and objectives as part of the elements for the define business process. Which one of the following statements best describes the business goals and objectives element?

Question86: Which of the following is the process of identifying and assessing factors that may jeopardize the success of a project or the achievement of a goal?

Question87: A business unit of a transnational manufacturer wants to implement a robust process for addressing integrity- critical equipment deterioration incidents. Timely and complete resolution of such incidents is vital for the business unit's continuous safe and profitable operation. Treating each incident involves many employees from different departments extensively collaborating and exchanging information. That information is spread across multiple systems having their access limited to particular user groups. With the current manual process, some incidents get forgotten and remain unresolved for years.
The project's Sponsor is an Equipment Integrity and Reliability Advisor, who moved into this position from another business unit. That business unit implemented a proprietary application to integrate the information and to assist in tracking and managing the incidents. Having a positive experience with the application, the Sponsor is suggesting to customize it and reuse in the new business unit.
The business unit's Enterprise Architect (EA), who is responsible for assessing solution options and presenting them to executive decision makers, has a few concerns with adopting the existing application. The application uses point-to-point interfaces with other data sources whereas the business unit's target architecture relies on a data warehouse-based integration. Moreover, the two business units use different legacy systems, as well as different front-end implementation technologies. Additionally, the existing application is monolingual, while the business unit needs user interfaces and some data to be presented in two languages. With all of this, it may be easier to build a new application from scratch than to customize the existing one. To understand which option is better, the EA asks a business analyst (BA) to define business requirements.
Through the elicitation process, the BA identifies the following requirement: "Particular incident-related activities require approval by authorized personnel before beginning them, as well as confirmation of acceptance of their completion." What kind of asset should the BA provide to fully specify the approval requirement?

Question88: Which of the following is a visual decomposition of the program scope and the resources needed in order to create the things defined within the program scope?

Question89: Marcy is the business analyst for her organization. She is completing the business analysis task of defining the business needs. She has the business goals and objectives and the requirements stated documentation. What must she confirm about the requirements stated documentation before defining the business need based on her analysis?

Question90: A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.
The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.
A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

Each truck can only make two trips a day. The BA has noticed that only 30% of trips have their orders available for loading when a truck arrives. Otherwise the truck has to wait one extra hour until the orders are picked and brought to the loading bay.
If trucks are the only constraint, approximately how many hours are lost due to this downtime?

Question91: You are the business analyst for the NHQ Organization. Management has asked that you examine the workflow and internal processes for order fulfillment. Specifically they'd like you to complete an in-depth analysis and documentation of the business problems and opportunities that may be exist for the organization. What business analysis knowledge area does this activity map to?

Question92: A team is working on a user privilege and access control system. A business analyst (BA) selects use cases as the technique for requirements specification.
What is the relationship between use cases "Create a role" and "Find a role" when there is a high level of formality?

Question93: Mary is the business analyst for your organization. She asks you what the purpose of the assess capability gaps task is. Which of the following is the best response to give Mary?

Question94: You are the business analyst for a large project for your organization. Your project has 65 stakeholders and this will greatly increase the complexity of the communication in this project. To demonstrate how complex this project and its communication will be, you show the management the number of communication channels in this project.
How many channels exist in this project based on the number of stakeholders?

Question95: What element of the plan business analysis process affects the business analysis duties that need to be performed?

Question96: A business analyst (BA) is preparing a governance approach. The BA is trying to define the approval process.
Which factors should the BA consider?

Question97: Which of the following quantitative risk analysis techniques relies on experience and past data to compute the probability and impact of risks on project objectives?

Question98: You are the business analyst for your organization and are planning the business analysis approach. One of the techniques you are considering for this undertaking is to rate the available methodologies against the organizational needs and objectives. Which of the following terms describes the business analysis technique that you are currently considering in this scenario?

Question99: An organization has a procedure for receiving requests from its customers: investigating each and then replying with an answer. The general manager asks a business analyst (BA) to identify ways to improve the current practice because it takes too long for the requests to be answered.
Which of the following techniques will the BA use to review the tasks?

Question100: Which of the following terms is used to describe a major deliverable or key even in the project used to measure project progress?

Question101: A business analyst (BA) is defining the decision making process for changes raised during a project and wants to understand the decision making authorities within the company.
What might the BA do to gather this information?

Question102: You are working with several business analysts to determine the solution approach for an identified problem.
All of the following techniques are acceptable for identifying the solution approach except for which one?

Question103: The business analyst (BA) has been tasked with assessing and recommending the best solution that fits an organization's need for a new third-party sales tool.
What technique would be used for identifying suitable options?

Question104: A business analyst (BA) wants to estimate the potential value delivered by a set of requirements and design options by targeting a small group of stakeholders to understand their perceived value and expectations. The BA is going to organize a discussion during which feedback is collected.
Which technique will be used?

Question105: Which of the following involves defining the various threats, determining the extent of vulnerabilities, and devising countermeasures against a possible attack?

Question106: You are the business analyst for your organization and are planning the business analysis approach. One of the techniques you are considering for this undertaking is to rate the available methodologies against the organizational needs and objectives. Which of the following terms describes the business analysis technique that you are currently considering in this scenario?

Question107: Which of the following processes is must at the end of each project phase to determine the completeness of the project work and to gain the customer's acceptance to move the project forward?

Question108: Which of the following defines how the project scope should be created, executed, monitored and controlled, and then validated?

Question109: What is the term used to describe the cost of the solution after the solution has been implemented in production by a vendor?

Question110: Which of the following models defines the name of the data, data aliases, and description of system data?

Question111: An organization implements a solution to increase the efficiency of its internal processes. The business analyst (BA) felt that the success of the solution is tied to the organizational structure and confirmed that the solution conforms to the organizational hierarchy. After the solution rolled out, the solution was not widely adopted among stakeholders and some features were not being utilized.
Which aspect of the organizational structure did the BA fail to consider?

Question112: A company finalized the implementation of a new, corporate-wide database. After nearly three months of operation, the solution is repeatedly producing invalid outputs. A business analyst (BA) has been asked to investigate the solution's problem. The BA has been able to find several instances where the outputs from the solution are below an acceptable level of quality.
Which of the following techniques should the BA use to identify the solution limitations?

Question113: A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.
The BA has collected the following information over the last three months pertaining to these business processes:
* All the business processes are at their maximum capacity in terms of the current number of transactions.
* Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.
The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

If the financial institution always works at full capacity month to month and the new success rate continues to remain the same after implementing the BA's recommendation, what is the average number of successes per month for the mortgage closure process, if the current process capability were increased by 50%?

Question114: A local manufacturer that serves about 1000 retail stores is experiencing a slow yet steady decrease of its customer base over the last couple of years. Attributing the situation to increased competition, management has hired a team of sales representatives to attract new clients and promote the manufacturer's products. However, after four months there is still no progress. Management has engaged a business analyst (BA) to investigate this issue.
What should the BA do first?

Question115: You are currently working on creating the activity list for an initiative in your organization.
What characteristic must be assigned to each task in your task list?

Question116: The requirements elicitation process requires that the business analyst and team prepare for the requirements elicitation activities. There are three specific inputs that the business analyst will need in preparing for the requirements elicitation.
Which of the following is NOT one of the three inputs the business analyst will use as he prepares for requirements elicitation?

Question117: You are the business analyst for your organization and are to conduct stakeholder analysis. Which of the following statements best describes the conduct stakeholder analysis task?

Question118: You are preparing a business case for your organization to determine the justification of the costs of the solution in relation to benefits the solutions will bring the organization. You need four inputs to complete this process. Which one of the following is not an input that will help you write the business case?

Question119: You are the business analyst for a large software development project. There are several issues that must be resolved by certain dates or the problem will prevent the project from advancing.
What technique can you use to track problems with the requirements?

Question120: A business analyst (BA) has just completed a number of elicitation activities and is preparing to review the stated requirements. As part of this, the BA is checking the compliance of the stated requirements with organizational standards for business analysis.
What state is the BA attempting to move the requirements into?

Question121: A business analyst (BA) was presenting requirements to all stakeholders, after having reviewed, structured and organized the requirements. The requirements were being presented in the form of multi layered business process models, using standard notations with proper sequencing of tasks. During the presentation, the project manager points out a few of the missing, inconsistent, and contradictory requirements.
What did the BA fail to perform?

Question122: Which of the following is described in the statement below?
"It shows the history and pattern of variation. It is a line graph that shows data points plotted in the order in which they occur. They show trends in a process over time, variation over time, or declines or improvements in a process over time. Trend analysis is performed using them."

Question123: Henry is the business analyst for the UUH Organization. Currently Henry is working on several work products as part of the requirements development process. He may need to share these work products with the stakeholders. Which of the following is not an example of a work product?

Question124: Which of the following is described in the statement below?
"It shows the history and pattern of variation. It is a line graph that shows data points plotted in the order in which they occur. They show trends in a process over time, variation over time, or declines or improvements in a process over time. Trend analysis is performed using them."

Question125: ________ are timeless events that show progress in the project. These are typically achieved at the end of phase in the project lifecycle.

Question126: Which of the following techniques is used to divide a project into controllable parts?

Question127: A company wants to launch an existing product in another channel and the business analyst (BA) is starting to perform the stakeholder analysis.

Legend: Influence/Impact 1 to 5 (1 = very limited impact/influence: 5 = very high impact/influence).
Considering the analysis, what values for influence and impact will the BA assign to the marketing?

Question128: A business analyst (BA) is working on a payment system (PS) implementation. A set of systems which should interact with a new system has been identified. The business analyst defined that a user with role of
"Supervisor" in the PS must pass a two-factor authentication before an execution of the functions: "Change system parameters" and "Set up new supervisor." A user must have the role of "Supervisor" to use the standard functions "Send mail notification" or "Send SMS notification".
The BA defined the following use cases:
*"Change system parameters"
*"Setup new supervisor"
*"Send mail notification"
*"Send SMS notification"
*"Send notification"
*"Pass a two-factor authentication"
The BA wants to create a Use Case diagram.
Which standard relationship should be defined between "Setup new supervisor" and "Send notification?

Question129: A very large insurer of General Liability and Property Damage insurance has an upward trend of increased claims over the past 5 years.
The Risk Control Area for that company has just completed a 12 month Pilot of a new improved Risk Control Site.
The purpose of the site is to help their customers manage their exposures and ideally prevent them from having claims There were 100 customers that were part of the Pilot that represented 25 different industries. The business goals were to increase use of the site and provide tools to help customer awareness of their exposures, so that they may reduce existing exposures and ultimately reduce claims.
The sites Features were as follows:
* Improvements to the search engine to all customers to search for articles, tools and services on the site
* A checklist function that allow customer to create their own unique Checklists or utilize a sample provided by ABC company to use daily, weekly etc for an area of their facility.
* A promotion feature - where Risk preventing Articles, and tools on the site are marketed toward a customer.
* A profile section allowing for Customer Name, Address and contact Phone number.
Alter the 12 month pilot the business sponsor received an assessment of what was working and what was not. The Assessment of the pilot revealed overall site activity had significantly increased, however only 5% of the time the promotions were viewed. And the most shocking was that total claims increased by nearly 20% for these 100 customers during the pilot period. The business sponsor was perplexed as he had an expectation of reduced claims and at least for 30% viewing of promotions since the project team had spent a lot of careful time and effort on this feature. A BA was assigned to do further analysis regarding the low use of the promotions and why claims were not being reduced.
Regarding the use of promotions the BA looked into other similar companies to see what they did differently to get their customer to look at their promotions. The BA found that similar companies had promotions that targeted the industry the customer was in so it was more relevant to them and they were more interested to view the promotion. In addition the BA sent out a survey to all 100 pilot customers asking probing questions about what they thought of the site and if they felt it had decreased their exposure to risk sufficiently. The Survey responses came back with raving positive comments and providing examples of how the site had been helping in the reduction of claims from the customer's perspective. In addition the survey also revealed insight that the customers found the promotion often irrelevant to their industry.
The BA asked for a dump of all documentation of the 1000 claims that were filed over the 12 month pilot period. The BA found the nearly 90% of the claim filed were all in one region of the country and were all for property damage related to several severe winter storms in the region and the claims were nearly all unavoidable by the customers. The BA brought all this analysis back to the business sponsor and made the recommendation to the business sponsor to require the customer to select 1 of 25 industries in their profile. This would in turn allow for the ability to show industry specific promotions and promote search results relative to a customer's industry to be sorted at the top giving the customer a more personalized experience.
What type of recommendation has the BA made to the business sponsor?

Question130: In a requirements management effort the business analyst (BA) has reviewed all the requirements and has completed assessing the various impacts of changes to some of the requirements. The BA is planning to share the impact of the changes to an the stakeholders and obtain a consensus in resolution of some of the changes.
Which technique will help the Ba obtain a resolution on the impact of the requirement changes?

Question131: A business analyst (BA) has just completed a number of elicitation activities and is preparing to review the stated requirements. As part of this, the BA is checking the compliance of the stated requirements with organizational standards for business analysis.
What state is the BA attempting to move the requirements into?

Question132: You and Tom are writing the solution scope for a new project in your organization. You need to create a method to define what solution will and will not provide for the organization. What technique can you and Tom use to establish appropriate boundaries for the solution?

Question133: Fred's organization is using a plan-driven approach for the business analysis deliverables. In this approach how will the requirements be captured?

Question134: Which of the following is a procurement document?

Question135: Which of the following roles approves the project scope statement, phase gate reviews, solution validations, scope changes, and project success criteria?

Question136: Donna is leading a brainstorming session for her organization. She has asked the participants in this group to come up with at least ten ideas for possible solutions to an identified problem. What is the problem with setting the goal as ten ideas for possible solutions in this session?

Question137: You are the business analyst for the NHQ Project. You have identified several stakeholders that need different types of information related to the requirements.
Which stakeholder would need detailed technical interface requirements?

Question138: You are the business analyst for your organization and are coaching Roberta on how business analysis works. Roberta is confused about what a business analysis methodology is during the business analysis planning and monitoring phase of the business analysis duties. What is a methodology?

Question139: Gina has been asked to provide decision analysis for her solution scope.
Which one of the following best describes the decision analysis technique?

Question140: Which of the following is a visual decomposition of the project scope?

Question141: What business analysis element tries to identify as many potential options as possible to meet the business objectives and fill identified gaps in capabilities?

Question142: What type of interview is the most common as part of requirements elicitation?

Question143: You are coaching Marcy, a new business analyst for your organization, on business analysis processes.
Marcy is concerned about the define solution scope process, especially the implementation approach element. Which of the following statements best defines the implementation approach element for Marcy?

Question144: Your organization is using a plan-driven approach to business analysis. What must you do with all of the communication documents created as part of this high-priority project that you are serving as the business analyst for?

Question145: A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a
75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.
The BA has collected the following information over the last three months pertaining to these business processes:
* All the business processes are at their maximum capacity in terms of the current number of transactions.
* Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.
The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

If the financial institution always works at full capacity month to month and the new success rate continues to remain the same after implementing the BA's recommendation, what is the average number of successes per month for the mortgage closure process, if the current process capability were increased by 50%?

Question146: What element of the plan business analysis process affects the business analysis duties that need to be performed?

Question147: Which stakeholder must approve the business analysis approach to ensure that the business analysis approach is compatible with the other project activities?

Question148: What requirements elicitation technique examines the available information, documentation, records, and history of a solution, organization, or cause to identify relevant information to the current business analysis duties?

Question149: A business analyst (BA) finds that the proposed solution has features used by a small group of stakeholders for business scenarios which may occur up to three times a year Out require a high effort to implement. What should the BA recommend in this cast?

Question150: Which of the following process models needs to complete each set of tasks in one phase before moving into the next phase in a project development life cycle?

Question151: Which of the following participants have to keep the minutes and details of the conversation during Interviews?

Question152: A popular department store chain wants to make computer upgrades as well as conduct a major remodeling effort to increase revenue to all their 100 stores over the next 2 years. The remodeling will occur in two phases. The two phases are required at each store and can be completed in any order, but each phase must be fully completed before the next phase can begin. Phase 1 will take approximately 32 weeks and will not require a store to be temporarily closed. Phase 2 will take approximately 20 weeks and will require a store to be temporarily closed.
In order to keep inventory level and total revenue for the department store chain at an operational level, 75% of the stores must remain open to the public at all times. Against the board of director's advice, the Chief Executive Officer (CEO) made a decision to start and complete the top 25 revenue-producing stores in the first year to get those stores remodeled and fully operational.
A business analyst (BA) has been brought in to help with planning the project and gathering requirements.
What tool will help the BA understand the changes needed to keep the majority of the stores open?

Question153: A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality.
Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.
The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.
The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.
The solution consultants have composed a set of as-is solution documents. A spreadsheet contains a catalog of brief definitions of all requirements with priorities assigned to them. A separate document explains data models and user interfaces. For the new and changed requirements, the BA wants to capture additional attributes such as the source, reason, complexity, and priority of change. Some of these requirements can be reused in other work.
How should information for these requirements be managed?

Question154: Gary is the business analyst for his organization and he is preparing a presentation about the requirements for a large software development project. Before Gary makes the presentation what should he do as part of his preparation for the presentation?

Question155: Which one of the following diagrams visualize the result of the root cause analysis study?

Question156: You are completing enterprise analysis. Management has asked you to create a document that will help them create a go/no go decision to invest and more forward with a proposed project.
What document does management want you to create?

Question157: Ben is the business analyst for his organization. Ben is currently working on a solution to improve a laser printer. He has taken the laser printer apart, identified each component, and documented each component's purpose. What type of requirements organization is Ben doing in this scenario?

Question158: You are the business analyst for your organization and are coaching Roberta on how business analysis works. Roberta is confused about what a business analysis methodology is during the business analysis planning and monitoring phase of the business analysis duties. What is a methodology?

Question159: A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.
The BA has collected the following information over the last three months pertaining to these business processes:
*All the business processes are at their maximum capacity in terms of the current number of transactions.
*Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.
The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

If an additional recommendation to reduce Verification Rejects by 50% were to be introduced into the mortgage origination process, what is the potential success rate of the mortgage origination process?

Question160: You are coaching Marcy, a new business analyst for your organization, on business analysis processes. Marcy is concerned about the define solution scope process, especially the implementation approach element.
Which of the following statements best defines the implementation approach element for Marcy?

Question161: You are the business analyst for a large project in your organization. While your company prefers face-to-face communications there are many stakeholders located in different geographical locations.
How can you still effectively serve as a business analyst when the stakeholders are not collocated?

Question162: A team of business analysts (BAs) were assigned to review an enhancement request that would involve changes in a stockroom and the inventory of products. The changes will impact several groups of people and the amount of savings is in excess of $1 million dollars. The recommended process improvement will be presented to management for approval.
What should the team do first?

Question163: Paul is the business analyst for his organization. He is examining a single solution to determine if the solution he and his team have identified carries enough business value to justify its implementation.
What business analysis process is Paul performing in this scenario?

Question164: Paul has been asked to complete SWOT analysis for his solution scope. What does SWOT analysis mean?

Question165: Which of the following requires that all parties in the conflict must give up something?

Question166: An organization is trying to streamline its current processes to improve performance and reduce costs. A business analyst (BA) conducted a process improvement workshop and identified the following issues as the top three items to be addressed:
1. There are multiple teams to define systems, functionality, and content. In many instances multiple teams are defining the same functionalities while other functionalities are not being defined at all, leading to unclear understanding of business requirements.
2. Product specification forms are published each year. A comparison tool is used to evaluate specification between yearly releases, but does not adequately identify changes between versions and needs to be improved.
3. Training consists of a new team member shadowing a seasoned team member. There are not written training materials for formal training sources therefore training is inconsistent and not meeting the needs of the organization.
The BA learns that formal training programs are not often devised for teams as small and diverse as this team, but still believes it is a viable solution to the training need. What type of analysis would help the BA gain approval to proceed with creating this type of training program for this team?

Question167: Sally is the business analyst for her organization. Sally and her business analysis team is currently using a business analysis approach to determine what the competition of her organization is offering prospective clients. She is trying to identify solutions to increase revenue by remaining competitive with the competition. What business analysis approach is Sally and her business analysis team using?

Question168: Which of the following defines the deliverable the customer is expecting?

Question169: One of the processes within requirements analysis is to prioritize requirements.
As a business analyst why would you ever want to prioritize requirements?

Question170: Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.
The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

The BA is working on identifying additional improvement opportunities based on these requirements.
Which of the following improvement opportunities is reflected in Requirement ID NFP0002?

Question171: You are the business analyst for your organization and are working with Jennifer to conduct stakeholder analysis. You would like to create a RACI chart to help with the roles of the people involved in the stakeholder analysis process. Jennifer is not familiar with this chart and asks what does RACI mean. Which one of the following best describes the RACI chart in the conduct stakeholder analysis process?

Question172: A project is implemented using a predictive approach. Unfortunately, a lot of change requests (CR) have been raised. A project manager (PM), who should approve each change request, is overworked.
What could the business analyst (BA) propose to make things better?

Question173: You are the business analyst for your organization. You are coaching Tom about the different approaches to business analysis.
Which type of business analysis approach has the most business analysis work at the beginning of the project or during the start of a project phase?

Question174: A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.
The BA has collected the following information over the last three months pertaining to these business processes:
* All the business processes are at their maximum capacity in terms of the current number of transactions.
* Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.
The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

Which of the following business processes can be identified for the process improvement initiative?

Question175: Which of the following is the formal acceptance of the project?

Question176: Which of the following is a visual decomposition of the program scope and the resources needed in order to create the things defined within the program scope?

Question177: Which one of the following statements best describes requirements prioritization?

Question178: Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.
The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

The BA is working on identifying additional improvement opportunities based on these requirements. Which of the following improvement opportunities is reflected in Requirement ID NFP0002?

Question179: In order to align with the added value required from the parcel tracking solution, what would be an important requirements' category for the BA to give more focus?

Question180: You are the business analyst for your organization and you are preparing to elicit the requirements for a new business opportunity. Which one of the following statements best describes the prepare for elicitation process?

Question181: You are the business analyst for your organization and are training Tracy on business analysis duties. You are explaining to Tracy how it's important for a business analyst to generate new ideas to approaching problems, solving problems, and to generate alternative solutions. You stress that it's important for the business analyst to generate new ideas and innovative concepts. What type of analytical thinking are you describing for Tracy?

Question182: Martha is observing Gary complete several activities as part of her requirements elicitation process. Martha is simply observing the steps Gary takes to complete his work and she is taking notes. In this instance Martha does not ask Gary any questions.
What type of observation technique is Martha completing?

Question183: You are the business analyst for your organization and are working on prioritizing the project requirements.
Management has asked you to prioritize the requirements based on the cost-benefit analysis for the requirements' value to the organization. What basis for prioritization are you using in this instance?

Question184: You are working with several business analysts to determine the solution approach for an identified problem. All of the following techniques are acceptable for identifying the solution approach except for which one?

Question185: You are the business analyst for your organization and you are completing the verify requirements process. There are eight characteristics each requirements should have: cohesive, complete, consistent, correct, and feasible. Which one of the following four is not a characteristic of a requirement?

Question186: Which of the following diagrams is used to display sensitivity analysis data?

Question187: A company is about to embark upon a large organizational change initiative that involves restructuring its service offerings. A senior business analyst (BA) is assigned the work of establishing performance measures for the business analysis work to be performed by the 6A ream. Which of the following performance measures is appropriate to assess the value delivered by the work products against the cost time, and resource investments expended to create them?

Question188: A business analyst (BA) finds that the solution service level agreement (SLA) cannot be met in one out of five identified scenarios, as there is a dependency on a requirement which is a part of a future release. How should the BA approach the solution limitation?

Question189: Which one of the following diagrams when properly laid out is always laid in a left to right display to properly reflect the chronology of all project work?

Question190: Which of the following roles works with the project team to understand the deliverables and then teaches the users of the deliverables how to utilize the project's product?

Question191: Which of the following phases is the first step towards creating a business continuity plan?

Question192: When can changes to requirements occur in a business analysis planning and monitoring assignment?

Question193: A business analyst (BA) asks participants in a workshop to write down their ideas about the feature being built on sticky notes, place them on the wall, and then group the ideas into similar themes. The BA is using this technique to:

Question194: Which of the following is derived from a schedule model to meet the project execution plan and achieve management approval for use as a baseline?

Question195: You are hosting a collection of stakeholders from across the organization to identify the ideas and attitudes about your company's help desk. You want the stakeholders to honestly share their opinions about the help desk service so you can identify problems, solutions, and take actions to improve the service. What type of requirements elicitation activity is this?

Question196: As part of the requirements analysis a business analyst can use the same tools and techniques to model the current state of an organization. All of the following are valid reasons why would a business analyst want to create a current state domain model except for which one?

Question197: A service provider has seen significant erosion of its profit margin so engages an external consultancy firm to assess its business operations and recommend options to improve profitability. What is the first step that the business analyst (BA) will perform as part of this engagement?

Question198: A business analyst (BA) has been writing requirements for a project that has several stakeholders with varying levels of product expertise.
What must the BA take into consideration to meet stakeholder perspectives?

Question199: Which of the following is concerned with determining whether the information used for risk analysis is probable, of high class, or accurate?

Question200: What document defines the business needs, identifies key stakeholders, and describes the positive impact the solution will provide on the key stakeholders?

Question201: A business analyst (BA) working on a recently implemented project is approached by the sponsor to provide artifacts that can be used organization wide for the long -term. Which of the following should the BA provide?

Question202: Your organization is using a plan-driven approach to business analysis.
What characteristic must be true of changes in the approach that your organization is using?

Question203: You are the business analyst for your organization. You are preparing the business needs documentation for a new solution to an identified problem. Parts of your input for this process are the business goals and objectives set by your organization. What approach can you use to assess the business goal and their validity and longevity?

Question204: You are the business analyst for your organization and are creating the solution scope definition.
Which of the following should be included in the solution scope definition?

Question205: In a software implementation project, the designated business analyst (BA) has conducted all the elicitation activities and now needs to confirm the elicitation results.
What is used by the BA Professional to guide which sources of information and which results are to be compared?

Question206: While reviewing a subset of requirements with stakeholders, a business analyst (BA) finds a requirement that does not deliver benefit to any of the stakeholders. After much discussion, the stakeholders decide that the requirement does not align with the solution scope.
What recommendation will the BA make?

Question207: Your organization completes software development for other companies as its core business.
Management would like to streamline the requirements gathering processes as many of the projects your company do are similar in nature. What approach could you as a business analyst do to help streamline the requirements gathering process for your organization?

Question208: The business analyst (BA) presented a concept model during a requirements walk through to the project sponsor, implementation subject matter expert and operational support start. While the presentation was clear to the project sponsor the other stakeholders were unsure about the impacts to their respective daily tasks. What should the BA include in the next walk through, so that all stakeholders have a better understanding of the requirements?

Question209: A martial arts organization has been expanding throughout the mid-Atlantic states and has hired a business analyst (BA) to create a system that will enable the organization to manage its growing needs. The following list describes some of the operations of the martial arts organization:
* The martial arts organization offers a variety of seminars to trainees that span the entire spectrum of the martial arts training system.
* Each seminar is made up of a set of techniques.
* Coaches in the martial arts organization are assigned seminars to teach according to the area that they specialize in and their availability.
* The martial arts organization publishes and maintains a web-based calendar of the different seminars (and the assigned coaches) every quarter for the trainees to view.
* The seminar administrator in the martial arts organization manages the seminars (including seminar content), assigns seminars to coaches, and defines the seminar schedule.
To ensure understanding of the business need, the BA has created three Unified Modelling Language (UML) diagrams, which are shown below:



The BA is finalizing the definition of the requirements architecture by understanding how requirements relate to each other. A key component that must be apparent in all three diagrams is that none of the requirements be linked in different or conflicting ways. What relationship quality criterion does this represent?

Question210: A large company has thousands of geographically dispersed employees and dozens of IT systems. Multiple business analysts (BAs) work in parallel on various requirements with different stakeholders. When considered in isolation, the requirements look meaningful and valuable to those who approved them. However, when it comes to implementation, some of the requirements appear to be contradicting each other. A lead BA recognizes that adding some traceability information would help uncover such conflicts early in the process.
To what should the BA trace the requirements?

Question211: An insurance company wants to increase sales by 15% and customer retention by 10% within 1 calendar year.
Various strategies to achieve this were considered and a restructure to the existing pricing model is selected to help achieve these goals.
A business analyst (BA) works with stakeholders such as actuaries, product specialists, sales staff, risk managers, and underwriters who agree to applying varying levels of discounts to customers based on:
*Total annual premium the customer has with the company (Financial worth)
*Time with the insurance company (Loyalty)
Various financial models are considered but the stakeholders agree that an initial applicable discount is determined based on the customer's overall premium:

The percentage of the maximum possible discount available to the customer is adjusted based on time with the company:

What did the BA create to ensure that everyone who needed to be included had been?

Question212: Which of the following software development life cycles is a methodology that divides the project into phases, and the project manager focuses on control of time, cost, and scope?

Question213: Which of the following requirement attributes lacks any ambiguous characteristics?

Question214: There are four inputs to writing the business case as part of enterprise analysis. Which one of the following is not an input to writing the business case process?

Question215: What type of interview is the most common as part of requirements elicitation?

Question216: Which one of the following terms is not a business analysis planning and monitoring approach?

Question217: A large insurance company wants to buy a new claims processing system or upgrade one of its two existing systems. Each year the claims department is given a $3,5 million budget to spend. Time is of the essence since there are some regulatory changes that will be coming the following year that will require several features that currently neither one of the two claims systems currently support.
There are eight stakeholders involved in this initiative. There are local to where the claim systems are managed, while five are located across the country. The business analyst (BA) struggled to get all stakeholders to agree on the desired features but ultimately got agreement on ten identified key features for the new claims systems. The BA was able to build a current state and future state process model which included all ten key features.
System A processes 75% of the company's claims. It is 5 years old and the claim processors love it because it is easy to use. However it must go offline for two hours each day. The code is very modular so it does have flexibility to be modified. To upgrade system A to have all ten features it would cost %5 million. System A would be at capacity if it were to process all of the company's claims.
System B processes 25% of the company's claims. It is an older mainframe system, but rarely goes offline. It could easily handle double the number of claims that system A processes. However, it has a lot of legacy code and would cost $6 million to upgrade.
Both systems have some of the ten desired key features. But neither system has all ten. The cost to buy a new system would be $7 million.
Below is the estimated cost for each feature in priority order.

What kind of analysis must the BA do to determine if one of the systems is better suited to be modified and upgraded?

Question218: A big construction company has grown into a group of 17 companies spread across the country. The rationale behind forming the group was to become more competitive in bidding for federal and regional government contracts. Another reason was to increase consolidated profitability by lowering the cost of materials and using combined assets more efficiently. Disjointed technological capabilities of the individual companies impede gathering the data needed to make decisions on both handling materials and allocating the resources.
What improvement opportunity does this represent?

Question219: An insurance company wants to increase sales by 15% and customer retention by 10% within 1 calendar year.
Various strategies to achieve this were considered and a restructure to the existing pricing model is selected to help achieve these goals.
A business analyst (BA) works with stakeholders such as actuaries, product specialists, sales staff, risk managers, and underwriters who agree to applying varying levels of discounts to customers based on:
*Total annual premium the customer has with the company (Financial worth)
*Time with the insurance company (Loyalty)
Various financial models are considered but the stakeholders agree that an initial applicable discount is determined based on the customer's overall premium:

The percentage of the maximum possible discount available to the customer is adjusted based on time with the company:

Which technique would the BA use to validate the desired outcomes?

Question220: Which of the following is a graphical representation of roles and responsibilities of different project team members?

Question221: A business analyst (BA) is working on a payment system (PS) implementation. A set of systems which should interact with a new system has been identified. The business analyst defined that a user with role of
"Supervisor" in the PS must pass a two-factor authentication before an execution of the functions: "Change system parameters" and "Set up new supervisor." A user must have the role of "Supervisor" to use the standard functions "Send mail notification" or "Send SMS notification".
The BA defined the following use cases:
* "Change system parameters"
* "Setup new supervisor"
* "Send mail notification"
* "Send SMS notification"
* "Send notification"
* "Pass a two-factor authentication"
The BA wants to create a Use Case diagram.
Which standard relationship should be defined between "Setup new supervisor" and "Send notification"?

Question222: Enterprise analysis provides many things for an organization. All of the following are tasks included in enterprise analysis except for which one?

Question223: A company that specialized in manufacturing vending machines for books has been in business for 10 years. As the e-book and online retailing grow, the company perceived that a change is required to respond to the new emerging market forces. However, the change should focus on reusability as much as possible to reduce expenses. After analyzing the current state with the business subject matter experts, the business analyst (BA) proposed investing in a new business line of vending machines that sell pay per use mobile device phone fast charging stations.
Due to the urgency of this change, the BA was asked to finalize requirements elicitation in the shortest possible time.
By proposing this change, what type of view did the BA use to analyze the current manufacturer's state?

Question224: You have identified several stakeholders that you believe are kinesthetic learners.
Which statement best describes the kinesthetic learning approach?

Question225: Your organization is using a plan-driven approach to business analysis.
What must you do with all of the communication documents created as part of this high-priority project that you are serving as the business analyst for?

Question226: Which one of the following diagrams when properly laid out is always laid in a left to right display to properly reflect the chronology of all project work?

Question227: You are the business analyst for your organization. On your current project you'll be using the change-driven approach for defining requirements and gathering feedback. Which of the following statements best describes the change-driven approach?

Question228: You are the business analyst for the NHQ Project. You have identified several stakeholders that need different types of information related to the requirements. Which stakeholder would need detailed technical interface requirements?

Question229: A business analyst (BA) is tasked with developing a business analysis plan and must decide the best approach to use. Which of the following factors would drive the decision towards an adaptive approach?

Question230: Which of the following is a table of all stakeholders showing the mapping of which stakeholders will contribute information to other stakeholders?

Question231: What type of requirements elicitation technique is the Delphi Technique?

Question232: You are the business analyst for the TGH Organization and are determining if you should buy or build a solution for your company. You have determined that you can create the in-house solution for $78,000 with a monthly support cost of $8,765. A vendor can create the solution for $61,000 with a monthly support costs of $7,990. How long will it take your company to break even if you choose the internal solution versus the vendor's solution?

Question233: During a requirements review, the implementation subject matter expert (SME) identified the requirement
'parsing of data' that must be implemented before other requirements. The business analyst (BA) has given this requirement high priority.
What factor influenced the prioritization of the requirement?

Question234: A popular department store chain wants to make computer upgrades as well as conduct a major remodeling effort to increase revenue to all their 100 stores over the next 2 years. The remodeling will occur in two phases. The two phases are required at each store and can be completed in any order, but each phase must be fully completed before the next phase can begin. Phase 1 will take approximately 32 weeks and will not require a store to be temporarily closed. Phase 2 will take approximately 20 weeks and will require a store to be temporarily closed.
In order to keep inventory level and total revenue for the department store chain at an operational level, 75% of the stores must remain open to the public at all times. Against the board of director's advice, the Chief Executive Officer (CEO) made a decision to start and complete the top 25 revenue-producing stores in the first year to get those stores remodeled and fully operational.
A business analyst (BA) has been brought in to help with planning the project and gathering requirements. Based on the CEO's executive decision, which risk tolerance attitude is the CEO exhibiting?

Question235: You are the business analyst for your organization and are trying to determine the best solution for an identified problem. You have determined that you could create a software solution using inhouse resources for $65,000 and with an ongoing support of $5,600 per month. A vendor offers you a quote that they can create the software for $49,000 with an ongoing support of $6,100 per month. Which solution should you choose?

Question236: Holly is the business analyst for her organization. Holly encourages teamwork and open communications among the business analysis team and the stakeholders. She wants stakeholders to drop by her office and freely discuss the requirements, the solution scope, and other concerns about the solution she's working on. Holly definitely prefers informal communications.
What is the danger Holly may experience with informal communications?

Question237: You are the business analyst for your organization and management has asked that you identify opportunities to improve the operations of the business. You notice that some of the stakeholders use several pieces of software and several duplicate activities within each software package to generate data reports for customers. What type of recommendation can you make in regard to this observation?

Question238: The business process model is also known as _________.

Question239: Which of the following processes is used to make certain that the project team members are completing the project work according to the project plan?

Question240: A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.
The BA has collected the following information over the last three months pertaining to these business processes:
*All the business processes are at their maximum capacity in terms of the current number of transactions.
*Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.
The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

If an additional recommendation to reduce Verification Rejects by 50% were to be introduced into the mortgage origination process, what is the potential success rate of the mortgage origination process?

Question241: A business analyst (BA) is working on a stakeholder collaboration plan. The main goal is to select the approaches that work best to meet the needs of external and internal stakeholders.
Which aspects should be taken into account?

Question242: A business analyst (BA) has defined a business analysis approach and presented the documents to the sponsors, the senior executives, the domain experts, the project manager and the head of technology, to obtain agreement from all. At this juncture, the prefect manager objected to some of the estimates determined m the budget and refused to agree with the estimates. Which guideline or tool, if followed by the BA.
Would have helped in avoiding such disagreements?

Question243: There are 50 stakeholders in the current project. How many communication channels exist in this project?

Question244: A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality.
Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.
The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.
The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.
What should define the timing of business analysis work in this project?

Question245: A business analyst (BA) is working on a payment system (PS) implementation. A set of systems which should interact with a new system has been identified. The business analyst defined that a user with role of
"Supervisor" in the PS must pass a two-factor authentication before an execution of the functions: "Change system parameters" and "Set up new supervisor." A user must have the role of "Supervisor" to use the standard functions "Send mail notification" or "Send SMS notification".
The BA defined the following use cases:
*"Change system parameters"
*"Setup new supervisor"
*"Send mail notification"
*"Send SMS notification"
*"Send notification"
*"Pass a two-factor authentication"
The BA wants to create a Use Case diagram.
What standard relationship should be defined between "Change system parameters", "Setup new supervisor" and "Pass a two-factor authentication"?

Question246: You are the business analyst for your organization and are trying to determine the best solution for an identified problem. You have determined that you could create a software solution using inhouse resources for $65,000 and with an ongoing support of $5,600 per month. A vendor offers you a quote that they can create the software for $49,000 with an ongoing support of $6,100 per month. Which solution should you choose?

Question247: You are the business analyst for your organization and preparing to complete the requirements elicitation activities. Your manager wants to know when the requirements elicitation process will be completed. Which of the following responses best describes the nature of the requirements elicitation process?

Question248: The business analyst (BA) is preparing to determine the impact of various risks associated with the business analysis effort currently underway.
Which of the following would the BA use as an input into the assessment of risk?

Question249: What is the purpose of the business case?

Question250: Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.
The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

The risk associated with Requirement ID F-P0001 is HIGH. The BA has gone back to the Crew Chief to determine why this requirement's risk is HIGH. The Crew Chief stated that it was based on an assumption.
Which of the following assumptions would make this requirement's risk high?

Question251: A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.
The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.
The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.
The solution consultants have composed a spreadsheet with all requirements that are already implemented in the solution. The requirements in the catalog are organized partially by user tasks and partially by system features. The branch has distinct definitions of PGA user roles and uses a different approach to structuring requirements specifications.
How should the BA organize the customization requirements?

Question252: A business analyst (BA) is developing an approach for information management. The BA needs to identify and categorize which information is to be managed.
Which of the following techniques should the BA use to achieve this objective?

Question253: Wanda is the business analyst for her organization and she is currently working on the specify and model requirements process. One of the elements of this process is the documentation of the textual requirements. Wanda must describe the capabilities of the solution, any conditions that must exist for the requirements to operate, and what third component of the textual requirement?

Question254: As part of identifying an enterprise's capability to adopt a potential solution, a business analyst (BA) is reviewing existing processes and tools within the enterprise for their ability to adapt to a new solution.
Which of the following assessments is the BA performing?

Question255: What portion of the communications model could be defined as the translator?

Question256: You are completing the prepare for elicitation process for an identified problem in your organization. The prepare for elicitation process requires three inputs for this process. Which one of the following is not an input that will help you prepare for the elicitation activities?

Question257: You are creating a model for your requirements. Which model type categorizes and describes the people who directly interact with a solution?

Question258: Holly is the business analyst for her organization. Holly encourages teamwork and open communications among the business analysis team and the stakeholders. She wants stakeholders to drop by her office and freely discuss the requirements, the solution scope, and other concerns about the solution she's working on.
Holly definitely prefers informal communications. What is the danger Holly may experience with informal communications?

Question259: A business analyst (BA) is compiling a communication plan by reviewing stakeholders and identifying the needs of the stakeholders. The BA organizes the stakeholders based on their needs and decides that all communication will be handled through e-mail so that information can be disseminated quickly and easily while maintaining a record. What has the BA missed in the stakeholder analysis?

Question260: Which of the following is the process of developing a document that formally authorizes a project or a phase?

Question261: ________ are timeless events that show progress in the project.
These are typically achieved at the end of phase in the project lifecycle.

Question262: Due to the complexity of a project, the project board is concerned that the business analyst (BA) will not be able to ensure all requirements are verified. What tool can the BA present to the project board to mitigate their concern?

Question263: A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:
1. Ability to integrate online maps and global positioning system (GPS) technology with the mobile application In real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.
II. Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.
III. Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.
Through requirements workshops the business analyst elicits the following detailed business requirements:
1. The company's mobile application platform must support real time integrate with the following third party systems:
1. GPS System
2. Postal Code Validation
What kind of relationship is used to describe the traceability between requirement 8 and the solutes artifacts that implement it?

Question264: You are the business analyst for the NHQ Organization. Management has asked that you examine the workflow and internal processes for order fulfillment. Specifically, they'd like you to complete an in-depth analysis and documentation of the business problems and opportunities that may be exist for the organization.
What business analysis knowledge area does this activity map to?

Question265: A very large insurer of General Liability and Property Damage insurance has an upward trend of increased claims over the past 5 years.
The Risk Control Area for that company has just completed a 12 month Pilot of a new improved Risk Control Site.
The purpose of the site is to help their customers manage their exposures and ideally prevent them from having claims. There were 100 customers that were part of the Pilot that represented 25 different industries.
The business goals were to increase use of the site and provide tools to help customer awareness of their exposures, so that they may reduce existing exposures and ultimately reduce claims.
The sites Features were as follows:
* Improvements to the search engine to all customers to search for articles, tools and services on the site.
* A checklist function that allow customer to create their own unique Checklists or utilize a sample provided by ABC company to use daily, weekly etc for an area of their facility.
* A promotion feature - where Risk preventing Articles, and tools on the site are marketed toward a customer.
* A profile section allowing for Customer Name, Address and contact Phone number.
After the 12 months pilot, the business sponsor received an assessment of what was working and what was not. The Assessment of the pilot revealed overall site activity had significantly increased, however only 5% of the time the promotions were viewed. And the most shocking was that total claims increased by nearly 20% for these 100 customers during the pilot period. The business sponsor was perplexed as he had an expectation of reduced claims and at least for 30% viewing of promotions since the project team had spend a lot of careful time and effort on this feature. A BA was assigned to do further analysis regarding the low use of the promotions and why claims were not being reduced.
Regarding the use of promotion the BA looked into other similar companies to see what they did differently to get their customer to look at their promotions. The BA found that similar companies had promotions that targeted the industry the customer was in so it was more relevant to them and they were more interested to view the promotion. In addition the BA sent out survey to all 100 pilot customers asking probing questions about what they thought of the site and if they felt it had decreased their exposure to risk sufficiently. The Survey responses came back with raving positive comments and providing examples of how the site had been helping in the reduction of claims from the customer's perspective. In addition the survey also revealed insight that the customers found the promotion often irrelevant to their industry.
The BA asked for a dump of all documentation of the 100 claims that were filed over the 12 month pilot period.
The BA found the nearly 90% of the claim field were all in one region of the country and were all for property damage related to several severe winter storms in the region and the claims were nearly all unavoidable by the customers. The BA brought all this analysis back to the business sponsor and made the recommendation to the business sponsor to require the customer to select 1 of 25 industries in their profile. This would in turn allow for the ability to show industry specific promotions and promote search results relative to a customer's industry to be stored at the top giving the customer a more personalized experience.
What was the business sponsor looking to validate about the use of promotions?

Question266: You are creating a model that shows how data moves through a system. Each function that modifies the data in any manner is identified, decomposed to smaller levels, and the system is completely described from start to storage. What type of a modeling technique are you using in this scenario?

Question267: Which of the following is derived from a schedule model to meet the project execution plan and achieve management approval for use as a baseline?

Question268: When can changes to requirements occur in a business analysis planning and monitoring assignment?

Question269: Wanda is the business analyst for her organization and she is currently working on the specify and model requirements process. One of the elements of this process is the documentation of the textual requirements. Wanda must describe the capabilities of the solution, any conditions that must exist for the requirements to operate, and what third component of the textual requirement?

Question270: You are the business analyst for your organization and are trying to determine the best solution for an identified problem. You have determined that you could create a software solution using inhouse resources for
$65,000 and with an ongoing support of $5,600 per month. A vendor offers you a quote that they can create the software for $49,000 with an ongoing support of $6,100 per month.
Which solution should you choose?

Question271: Which of the following are directed conversations for gathering ideas, opinions about a product, service, problem, or opportunity?

Question272: Your organization is using a plan-driven approach to business analysis. What characteristic must be true of changes in the approach that your organization is using?

Question273: Which of the following documents is described in the statement below?
"It is a type of procurement document used to request proposals from prospective sellers of products or services."

Question274: You are the business analyst for your organization and are beginning the requirements analysis processes. Which one of the following statements best describes the requirements analysis processes?

Question275: You have identified several stakeholders that you believe are kinesthetic learners. Which statement best describes the kinesthetic learning approach?

Question276: It's often impossible or difficult to prove that the implementation of a solution will change the current state of an organization to the desired future state. The business analyst must document the characteristics and risk of the implementation of a solution in case the belief that the solution will achieve the desired results will prove invalid.
What is the belief that the solution will create the desired effect for the organization called?

Question277: The business analyst (BA) works in a global company and the majority of stakeholders are located in different countries The BA already explained the core requirements during the initial meetings. However due to the time zone differences it has been cumbersome to organize further meetings. What method should the BA use so the stakeholders can review the document before final approval?

Question278: You are creating the solution scope for an identified problem in your organization. You are working with several stakeholders during this process including the domain subject matter expert, the implementation subject matter expert, the project manager, and the sponsor. Which of these stakeholders will be responsible for writing the project scope?

Question279: A business analyst (BA) conducts a process analysis on the business analysis practices that were used on the previous major implementation. From this the BA identifies and documents that there are three improvement areas which would make the business analysis process more efficient. In which business analysis artifact does the BA document these measures of improvement for the next piece of analysis work?

Question280: Which of the following is the formal acceptance of the project?

Question281: An insurance company wants to increase sales by 15% and customer retention by 10% within 1 calendar year.
Various strategies to achieve this were considered and a restructure to the existing pricing model is selected to help achieve these goals.
A business analyst (BA) works with stakeholders such as actuaries, product specialists, sales staff, risk managers, and underwriters who agree to applying varying levels of discounts to customers based on:
* Total annual premium the customer has with the company (Financial worth)
* Time with the insurance company (Loyalty)
Various financial models are considered but the stakeholders agree that an initial applicable discount is determined based on the customer's overall premium:

The percentage of the maximum possible discount available to the customer is adjusted based on time with the company:

What did the BA create to ensure that everyone who needed to be included had been?

Question282: In a risk assessment exercise of a software implementation program, the business analyst (BA) has successfully computed the probability of occurrence (POC) and the cost of impact for each of the identified risks as follows:

Which of the following will have the highest negative impact to value?

Question283: You are creating the solution scope for a proposed solution in your organization. You need to understand the scope of work that needs to be completed. You elect to identify the solution scope and then break the solution scope into smaller work products or deliverables. What technique are you using in this instance?

Question284: You are the business analyst for a solution that has 435 stakeholders. How many communication channels exist in this project?

Question285: A company that specialized in manufacturing vending machines for books has been in business for 10 years. As the e-book and online retailing grow, the company perceived that a change is required to respond to the new emerging market forces. However, the change should focus on reusability as much as possible to reduce expenses. After analyzing the current state with the business subject matter experts, the business analyst (BA) proposed investing in a new business line of vending machines that sell pay per use mobile device phone fast charging stations.
Due to the urgency of this change, the BA was asked to finalize requirements elicitation in the shortest possible time.
The BA was able to complete requirements elicitation activities in a short period of time. Which type of elicitation approach did the BA use?

Question286: Which of the following defines how the project scope should be created, executed, monitored and controlled, and then validated?

Question287: What part of defining the business needs process will evaluate the ends that the organization is seeking to achieve?

Question288: A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.
The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.
A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

Each truck can only make two trips a day. The BA has noticed that only 30% of trips have their orders available for loading when a truck arrives. Otherwise the truck has to wait one extra hour until the orders are picked and brought to the loading bay.
If trucks are the only constraint, approximately how many hours are lost due to this downtime?

Question289: You are the business analyst for your organization and are working on a solution that will connect several databases to a web application. You are concerned that the databases may not be operable with the software solution a programmer is recommending. What requirements elicitation technique can help you determine the interoperability of the software, the databases, and the web application?

Question290: You are the business analyst for your organization and are coaching Roberta on how business analysis works.
Roberta is confused about what a business analysis methodology is during the business analysis planning and monitoring phase of the business analysis duties. What is a methodology?

Question291: You are the business analyst for your organization and working with the stakeholders to prioritize the requirements. The stakeholders are concerned about the financial impact of the requirements should some of them fail during the implementation. You would like to rank the risk tolerance of the stakeholders based on their comments about the solution and the requirements.
The following are the three categories of risk tolerance associated with the stakeholders except for which one?

Question292: You are the business analyst for your organization. Management wants you to prioritize the identified requirements by the requirements that have the highest likelihood of success. Why would management want you to prioritize the requirements with this factor even though some of the requirements may be difficult to implement?

Question293: Robert is the business analyst for his organization and he's working with several stakeholders to identify the business need for an opportunity. Robert needs to identify the stakeholder that will be responsible for authorizing the actions needed in order to meet the identified business need.
Which stakeholder does Robert need to identify?

Question294: A software company has won a contract to implement its product for a client. As part of the implementation work, a business analyst (BA) is asked to elicit information about the other client applications that will interface with the new system and provide the information graphically. The technical staff needs to understand the message interaction within the systems for key business transactions.
Which type of diagram should the BA use?

Question295: A business analyst (BA) is facilitating a meeting between process owners to capture the business rules for a workflow solution. One of the attendees expresses a strong opinion that the solution will not deliver the expected value.
How will the BA ensure the process owner remains engaged and will support the change?

Question296: You are the business analyst for your organization and are leading a presentation about an identified problem.
This presentation will help the stakeholders to understand the problem and it will help you when you begin to elicit requirements from the stakeholders.
Which type of learner learns best through the presentation of models?

Question297: Ned is the business analyst for the NHQ Company. He is working with Stan on completing the requirements prioritization of all the identified requirements. Why would Stan and Ned complete requirements prioritization?

Question298: Which of the following techniques is used to test customer acceptance of the solution and to measure marketplace demand?

Question299: Bob and Susan are business analysts for their organization. They are examining two materials that could be used in an upcoming project. They are testing the materials and measuring the results of each test to compare the materials to each other. This process will help Bob and Susan determine which material is best for their upcoming project. What type of process are Bob and Susan completing with these materials?

Question300: After having created several prototypes of a new. web-based application, a business analyst (BA) would like to meet with the organization's stakeholders to elicit their perception ideas, and attitudes about the prototypes Which of the following techniques should the SA use?

Question301: You are the business analyst for your organization. Gary and Janet, two key stakeholders in the project, are in disagreement over a requirement for the type of software to be installed on the server your solution calls for.
What must happen in this instance before formal approval can be offered?

Question302: A business analyst (BA) has engaged various groups from across the organization to define the business opportunity a potential project will address. The BA must consolidate the information collected from the groups.
The BA should ensure the business needs.

Question303: A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:
I: Ability to integrate online maps and global positioning system (GPS) technology with the mobile application In real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.
II: Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.
III: Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.
Through requirements workshops the business analyst elicits the following detailed business requirements:
1. The company's mobile application platform must support real time integrate with the following third party systems:
A: GPS System
B: Postal Code Validation
What is the appropriate model type to assist the stakeholders in testing the performance and visual aspects of requirements 3 through 11?

Question304: You are the business analyst for a large project that will create new software for the entire organization. This new software will affect all of the administrative assistants in the organization schedule meetings, reserve facilities, and share calendars. There are approximately 2,400 administrative assistants in your organization and not all of these people can attend requirements gathering workshops.
What approach can you use to manage and gather requirements from these 2,400 administrative assistants?

Question305: A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.
The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.
A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

Each truck can only make two trips a day. The BA has noticed that only 30% of trips have their orders available for loading when a truck arrives. Otherwise the truck has to wait one extra hour until the orders are picked and brought to the loading bay.
If trucks are the only constraint, approximately how many hours are lost due to this downtime?

Question306: Which of the following document is created first after project is awarded and statement of work is handed over to the project manager?

Question307: You are the business analyst for the NGQ Company. Management is concerned that their company is not able to meet an identified business need with their current existing structure, people, processes and technology. They've asked you to complete an analysis of their organization's ability to meet the identified business need. What business analysis process are you completing for your organization?

Question308: You are the business analyst for a new project. Part of this project is for the project team to manually install new workstations through the company's campus. Based on your research you have determined that the project team can install 25 new workstations per hour. Since there is a fixed amount of time that these workstations need to be installed you are considering adding additional labor for the implementation. You are also considering to adjust the prioritization of the project requirements based on the amount of workstations the project team can install per hour.
What does the 25 workstations per hour represent in this scenario?

Question309: Which of the following is not a hygiene agent according to Frederick Herzberg theory?

Question310: You are the business analyst for your organization and are preparing to complete the allocate requirements process. This process assigns stakeholder and solution requirements to solution components and to releases. One of the elements of this process is solution components. All of the following are solution components except for which one?

Question311: Holly is the business analyst for her organization. Management has asked Holly to create a document that will define solution alternatives and how each identified solution may provide an expected business benefit to meet the identified business need. Management has asked Holly to provide data and statistics in this document to support her claims and findings.
What type of document is management asking Holly to create?

Question312: The creative thinking process has three values to determine the effectiveness of the process.
Which one of the following is not a measurement of effective creative thinking?

Question313: What type of a business analysis approach focuses on the rapid delivery of business value in short iterations?

Question314: Which of the following requirement attributes lacks any ambiguous characteristics?

Question315: Henry is the business analyst for his organization. Management has created a pre-determined budget of
$450,000 for his solution. Henry has identified the project requirements but now wants to prioritize them based on timeboxing and budgeting. Henry examines the cost of the requirements and begins removing the requirements from the allowed list in order to meet the $450,000 budget. What timeboxing or budgeting approach is Henry using?

Question316: Which of the following techniques involves attempting to make and numerically determine the probability of various adverse events and measuring the likely extent of the losses?

Question317: Marcy is the business analyst for her organization. She is completing the business analysis task of defining the business needs. She has the business goals and objectives and the requirements stated documentation.
What must she confirm about the requirements stated documentation before defining the business need based on her analysis?

Question318: Which of the following qualitative techniques involves a disciplined analysis of the event sequences that could transform a potential hazard into an accident?

Question319: The ____, an output of the define scope process, does document the process and criteria for accepting completed products.

Question320: When do change requests generally increase in a project?

Question321: The business analysis approach generally defines all of the following attributes except for which one?

Question322: You are the business analyst for your organization and working with the stakeholders to prioritize the requirements. The stakeholders are concerned about the financial impact of the requirements should some of them fail during the implementation. You would like to rank the risk tolerance of the stakeholders based on their comments about the solution and the requirements. The following are the three categories of risk tolerance associated with the stakeholders except for which one?

Question323: Before investing further in the project, a customer and the stakeholder of the project wants to be able to visualize the final product. Which elicitation technique should the business analyst (BA) select?

Question324: A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.
The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.
A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

What is the company's primary business objective in this scenario?

Question325: During a retrospective, the project team agrees the way they organized the user stories during the first sprint could be improved. The business analyst (BA) plans to make the stones more accessible going forward. Which of the following will the BA update?

Question326: While defining what necessary conditions are required to achieve the business need for a highly regulated government client, a business analyst (BA) discovers that some legacy policies will either constrain or are insufficient to achieve value desired by the future state.
How should the BA proceed?

Question327: Which solution scope technique can help the business analyst understand the scope of the work by breaking down the scope into smaller work products?

Question328: Mark is the business analyst for his organization. He is working with the solution development team and he believes that the team does not want to implement a certain portion of the requirements. The team is expressing the difficulty of the requirements and how it will be extremely challenging to complete. When Mark asks about a similar project that the team completed, they insist that this is a different type of requirements though Mark believes that it is not. What is the solution development team appearing to do to the requirements?

Question329: You are the business analyst for the YGT Organization. You have just completed a capabilities gap assessment and have determined that your organization does not have the necessary resources and technology to seize a business opportunity. What is the most likely course of action for the organization?

Question330: ____ is the degree to which a set of inherent characteristics fulfills requirements.

Question331: Your organization is trying to determine which one of two opportunities they will pursue. The Project A is worth
$235,987 and Project B is worth $567,000 but carries significant risk. The organization elects to purse Project B and not Project A.
What is the opportunity cost in this scenario?

Question332: All of the following are techniques that can be used to specify or model requirements except for which one?

Question333: You are the business analyst for a new project. Part of this project is for the project team to manually install new workstations through the company's campus. Based on your research you have determined that the project team can install 25 new workstations per hour. Since there is a fixed amount of time that these workstations need to be installed you are considering adding additional labor for the implementation. You are also considering to adjust the prioritization of the project requirements based on the amount of workstations the project team can install per hour.
What does the 25 workstations per hour represent in this scenario?

Question334: A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:
Ability to integrate online maps and global positioning system (GPS) technology with the mobile application in real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.
II. Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.
III. Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.
Through requirements workshops the business analyst elicits the following detailed business requirements:
1. The company's mobile application platform must support real time integration with the following third party systems:
A ) GPS System
B ) Postal Code Validation
2. The service providers available for selection must participate in the subscriber's medical plan network as of the current system date.
3. The map display shall highlight the boundary of the search area with a dotted yellow line.
4. The extent and shape of the search area shall be determined based on one of the following user choices:
1 ) Postal code - Subscriber location acquired from GPS shall be used to determine and populate the related postal code as the default postal code with options for the user to change the postal code.
2 ) Radius for the search area around the subscriber's location, that will have default value of 5 miles. The radius can be changed by the subscriber with a maximum range of 50 miles.
5. Subscriber shall be able to select one of the options above and supply corresponding input.
6. System shall validate the user input and display appropriate error messages if invalid.
7. Based on the inputs and the plan of the subscriber, the system shall retrieve information for the participating service providers that are located within the designated search area.
8. System shall display a map including visual markers to indicate locations of the service providers in the top half of the device screen and a list of the same service providers in the bottom half of the device screen.
9. The list of service providers shall include the Name, Phone Number and Street Address.
10. If the subscriber specified the radius or retained the default postal code for the search area, the list shall additionally include the approximate driving distance in miles from the subscriber's last registered location and the list shall be sorted in the ascending order of the driving distance.
11. The subscriber shall be able to select a service provider either from the list or from the map and download a document that contains the name, contact telephone, email address, fax number and the fee schedule for the covered services applicable to the subscriber's plan.
Which primary subscriber business need is addressed with the enhancements?

Question335: Which of the following displays the relative importance of the defects?

Question336: The creative thinking process has three values to determine the effectiveness of the process.
Which one of the following is not a measurement of effective creative thinking?

Question337: You are the business analyst for your organization and have many solutions available to an identified problem. You would like a way to quickly and fairly determine which solution is the best choice for your organization. Which of the following approaches would allow you to determine the top-rated solutions for your organization?

Question338: You are the business analyst for your organization and are working on prioritizing requirements.
What plan should guide you through this process?

Question339: You are the business analyst for your organization and preparing to complete the requirements elicitation activities. Your manager wants to know when the requirements elicitation process will be completed.
Which of the following responses best describes the nature of the requirements elicitation process?

Question340: Which of the following represents the duration of activities against a calendar?

Question341: What does the T in SWOT analysis mean?

Question342: When can changes to requirements occur in a business analysis planning and monitoring assignment?

Question343: You are completing the requirements for vendor selection and need to create a procurement form that will ask the vendor to provide only a price for commercial-off-the-shelf solution. What type of procurement form will you need to provide to the vendor?

Question344: Which of the following statements best describes the purpose of the confirm elicitation results process?

Question345: It's often impossible or difficult to prove that the implementation of a solution will change the current state of an organization to the desired future state. The business analyst must document the characteristics and risk of the implementation of a solution in case the belief that the solution will achieve the desired results will prove invalid.
What is the belief that the solution will create the desired effect for the organization called?

Question346: Management has asked you, a business analyst for your organization, to create the solution scope for an identified problem. In order to complete this task you'll need three elements. All of the following are elements you'll need in order to write the solution scope except for which one?

Question347: All of the following are techniques that can be used to specify or model requirements except for which one?

Question348: The stakeholders are interested in ensuring that expected value is assessed prior to acceptance. To determine if the solution is providing expected value and ensure the accuracy of the measurements, the stakeholders and the business analyst (BA) determine that they need to measure .

Question349: Which of the following process groups occurs at the beginning of the project?

Question350: You are the business analyst for your organization. Management wants you to prioritize the identified requirements by the requirements that have the highest likelihood of success. Why would management want you to prioritize the requirements with this factor even though some of the requirements may be difficult to implement?

Question351: Which of the following diagrams is known as Ishikawa diagram?

Question352: A new project has to implement a cyber security release in China, Italy, Germany, the United States, and Canad a. The project is a $5 million initiative and must 'go live' in production in all countries on the same day and time to be effective.
Which of the approaches mentioned is suitable for this project based on the size and complexity?

Question353: Which of the following types of charts shows which resources are needed in the project and allows you to group the resources by project phase or other attributes?

Question354: ____ is the degree to which a set of inherent characteristics fulfills requirements.

Question355: Which of the following captures all of the activities within a business, the inputs and outputs of each activity, and the required resources to complete each activity?

Question356: A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:
I: Ability to integrate online maps and global positioning system (GPS) technology with the mobile application In real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.
II: Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.
III: Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.
Through requirements workshops the business analyst elicits the following detailed business requirements:
1. The company's mobile application platform must support real time integrate with the following third party systems:
A: GPS System
B: Postal Code Validation
What kind of relationship is used to describe the traceability between requirement 8 and the solutes artifacts that implement it?

Question357: A conservative company with rigorous risk control plans and internal audit rules has a recurrent problem with a core Business application. As a result access to this application must be restricted and controlled and maintenance must be on-site. However the company feels that the application must have an emergency service team. The routine maintenance of this solution is provided by an external vendor and the vendor requested 24 hours remote access to quality and production data. In this context what is the company's response to the vendor's request?

Question358: A business analyst (BA) is working on a stakeholder collaboration plan. The main goal is to select the approaches that work best to meet the needs of external and internal stakeholders.
Which aspects should be taken into account?

Question359: You are the business analyst for your organization. You are currently working with Steve on the organize requirements process. You and Steve have elected to use the user stories approach for this process. What is the user stories approach for requirements organization?

Question360: The stakeholders are interested in ensuring that expected value is assessed prior to acceptance. To determine if the solution is providing expected value and ensure the accuracy of the measurements, the stakeholders and the business analyst (BA) determine that they need to measure __________.

Question361: Which conduct stakeholder analysis technique is useful for identifying shared characteristics of a stakeholder group?

Question362: A business analyst (BA) has defined a business analysis approach and presented the documents to the sponsors, the senior executives, the domain experts, the project manager and the head of technology, to obtain agreement from all. At this juncture, the prefect manager objected to some of the estimates determined m the budget and refused to agree with the estimates. Which guideline or tool, if followed by the BA. would have helped in avoiding such disagreements?

Question363: The, an output of the define scope process, does document the process and criteria for accepting completed products.

Question364: A business analyst (BA) is planning for an upcoming solution based on a signed contract with a client but has learned that one of the key subject matter experts is unavailable during the first half of the business analysis phase. The project has a tight timeline and firm deadline that is part of the contract. There are no substitutes for the key subject matter expert.
How should the BA proceed?

Question365: Jenni is the business analyst for the UHQ Organization. She is preparing to complete the conduct elicitation activity for her organization. Jenni can use all of the following techniques as part of this activity except for which one?

Question366: Which one of the following is the most accurate definition of the solution scope?

Question367: The seminar administrator reviewed these three diagrams and asked the BA to create a fourth diagram to model the various levels that a trainee goes through (e.g., white belt to yellow belt yellow belt to green belt etc). What modeling technique will the BA use to create this diagram?

Question368: Several commercial-off-the-shelf (COTS) software packages exist that would enable the business analyst (BA) to meet the needs of the business. For the potential design option the BA included one of the COTS packages as a solution approach. What kind of solution approach is this?

Question369: You have completed the requirements documentation and the stakeholders have signed off on the requirements. Now the requirements are advancing into a project as your organization has chartered a project based on the identified requirements. What stakeholder is now responsible for assessing the solution scope to determine the project scope?

Question370: Which of the following inputs of Monitor and Control Risks acquires information from performance measurements and evaluates it to provide variance analysis and forecasting?

Question371: What business analysis element tries to identify as many potential options as possible to meet the business objectives and fill identified gaps in capabilities?

Question372: Your organization is using a plan-driven approach to business analysis. What must you do with all of the communication documents created as part of this high-priority project that you are serving as the business analyst for?

Question373: Fred's organization is using a plan-driven approach for the business analysis deliverables. In this approach how will the requirements be captured?

Question374: Company A has been engaged to provided solution software to Company B as part of a combined service offering to Company C.
The initiative requires a sub project for Companies A and B learn Company Cs statutory requirements, a sub project for Company A to write custom functionality for the solution, and a sub project for Company B to develop infrastructure and support for the solution as well as the main project of implementation and cutover from Company Cs current data processing solution to the service from Company B, How does the business analyst (BA) assign requirements to the various solution components to ensure all objectives are met?

Question375: A business analyst (BA) plans to hold a workshop next week to elicit requirements for a project. In an informal conversation, another employee mentioned that one of the attendees is likely to be unhappy about the project's impact on their work.
Which of the following techniques will the BA use to avoid disrupting the workshop?

Question376: An insurance company wants to increase sales by 15% and customer retention by 10% within 1 calendar year.
Various strategies to achieve this were considered and a restructure to the existing pricing model is selected to help achieve these goals.
A business analyst (BA) works with stakeholders such as actuaries, product specialists, sales staff, risk managers, and underwriters who agree to applying varying levels of discounts to customers based on:
*Total annual premium the customer has with the company (Financial worth)
*Time with the insurance company (Loyalty)
Various financial models are considered but the stakeholders agree that an initial applicable discount is determined based on the customer's overall premium:

The percentage of the maximum possible discount available to the customer is adjusted based on time with the company:

What did the BA create to ensure that everyone who needed to be included had been?

Question377: Management comes to you and asks you to complete some specifications and models about the current state of the organization. Management wants you to complete this business analysis activity as soon as possible and report back to them with your findings. What is the primary purpose of the specify and model requirements process?

Question378: A business analyst (BA) at a regional bank has recently been assigned to assist on a project to expand into new markets. The chief executive officer (CEO) envisions the bank as a national brand and has asked the chief financial officer (CFO) to monitor project progress closely. The project manager (PM) has asked the BAs on the team to recommend an appropriate business analysis approach.
Based on the nature of the project and the industry, which approach should they recommend?

Question379: A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a
75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.
The BA has collected the following information over the last three months pertaining to these business processes:
* All the business processes are at their maximum capacity in terms of the current number of transactions.
* Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.
The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

Assuming the BA's recommendation to be true, what will be the new success rate of the mortgage closure process?

Question380: You are the business analyst for the NGQ Company. Management is concerned that their company is not able to meet an identified business need with their current existing structure, people, processes and technology.
They've asked you to complete an analysis of their organization's ability to meet the identified business need.
What business analysis process are you completing for your organization?

Question381: Ned is the business analyst for the NHQ Company. He is working with Stan on completing the requirements prioritization of all the identified requirements. Why would Stan and Ned complete requirements prioritization?

Question382: All of the following stakeholders participate in the prioritization of requirements except for which one?

Question383: Henry is the business analyst for his organization and is completing the conduct elicitation activity.
Part of this activity is to record the results of the requirements elicitation process. All of the following are acceptable elements for requirements documentation except for which one?

Question384: A large insurance company wants to buy a new claims processing system or upgrade one of its two existing system. Each year the claims department is given a $3.5 million budget to spend. Time is of the essence since there are tome regulatory charges that will be coming the following year that will require several features that currently neither one of the two claims System currently support.
There are eight stakeholders onvolved in this initiative. There are local to where the claim system are managed, while five are located across the country. The business analyst (BA) struggled to get all stakeholders to agree on the desired features but ultimately got agreement on ten identified key features for the new claims system. The BA was able to build a current state and future state process model which included all ten key features.
System a processes 75% of the company's claims. It is 5 years old and the claim processors love it because it is easy to use. However it must go offline for two hours each day. The code is very module so it does have flexibility to be modified. To upgrade system A to have all ten features it would cost $5 million. System A would be at capacity if it were to process all of the company's claims.
System B process 25% of the company's claims. It is an older mainframe system, but rarely goes offline. It could easily handle double the number of claims that system A processes. However it has a lot of legacy code and would cost $6 million to upgrade.
Both system have some of the tem desired key features. But neither system has all ten. The cost to buy a new system would be $7 million.
Below is the estimated cost for each feature in priority order.

If the budget for the initiative was firm, what is a feasible solution to make sure the project stays within budget?

Question385: The solutes presented by a business analyst (BA) to the stakeholders eliminated the need to maintain different variations of ship-to-country and location-to-rout* for various freight carriers. Instead, the routing would use a standard carrier code, giving the business me flexibility to just ship to new countries without raising a change request to IT. which was the current road-block to business. What opportunity did the BA present to the stakeholders?

Question386: Management comes to you and asks you to complete some specifications and models about the current state of the organization. Management wants you to complete this business analysis activity as soon as possible and report back to them with your findings. What is the primary purpose of the specify and model requirements process?

Question387: A business analyst (BA) assigned to a project has been asked to implement regulatory requirements based on priority. What type of traceability relationship can the BA use to find an the solution components that need to be implemented?

Question388: Which of the following roles helps assess the data requirements of a project, identifies data assets, and helps the project team complete data modeling requirements?

Question389: You are coaching Marcy, a new business analyst for your organization, on business analysis processes. Marcy is concerned about the define solution scope process, especially the implementation approach element. Which of the following statements best defines the implementation approach element for Marcy?

Question390: You are creating the solution scope for an identified problem in your organization. You are working with several stakeholders during this process including the domain subject matter expert, the implementation subject matter expert, the project manager, and the sponsor. Which of these stakeholders will be responsible for writing the project scope?

Question391: When can changes to requirements occur in a business analysis planning and monitoring assignment?

Question392: Herb is the business analyst for the HYY Organization. As Herb is completing the organize requirements process he recognizes that requirements typically need to answer one question for identification. What is the one interrogative that requirements should answer?

Question393: Bob and Susan are business analysts for their organization. They are examining two materials that could be used in an upcoming project. They are testing the materials and measuring the results of each test to compare the materials to each other. This process will help Bob and Susan determine which material is best for their upcoming project.
What type of process are Bob and Susan completing with these materials?

Question394: Zoe is the business analyst for her organization. She is currently prioritizing the requirements based on the implementation difficulty of the requirements to help with the solution planning.
Which of the following best describes the approach Zoe is taking with requirements prioritization?

Question395: A business analyst (BA) at a regional bank has recently been assigned to assist on a project to expand into new markets. The chief executive officer (CEO) envisions the bank as a national brand and has asked the chief financial officer (CFO) to monitor project progress closely. The project manager (PM) has asked the BAs on the team to recommend an appropriate business analysis approach.
Based on the nature of the project and the industry, which approach should they recommend?

Question396: Which conduct stakeholder analysis technique identifies stakeholder roles that may serve as a useful starting point for identifying actors and roles?

Question397: A company that specialized in manufacturing vending machines for books has been in business for 10 years.
As the e-book and online retailing grow, the company perceived that a change is required to respond to the new emerging market forces. However, the change should focus on reusability as much as possible to reduce expenses. After analyzing the current state with the business subject matter experts, the business analyst (BA) proposed investing in a new business line of vending machines that sell pay per use mobile device phone fast charging stations.
Due to the urgency of this change, the BA was asked to finalize requirements elicitation in the shortest possible time.
Customers who want to utilize the pay per use mobile device fast charging stations may choose one of two features: fully charged (F1) or partially charged (F2). If partially charged is selected, the customer needs to specify their charging needs.
What is the relationship between Fl and F2?

Question398: You are the business analyst for your organization. Management realizes that a proposed solution has risks that may cause the entire project to fail. They would like you to prioritize the requirements with maximum risks first so that if the project fails, there is little loss of capital in the project implementation.
What requirements prioritization approach is management asking you to create in this instance?

Question399: A business analyst (BA) elicits requirements for the sales order processing of multiple product lines. Elicitation reveals that the business processes for the sales orders of most products follow similar activity patterns that have been established over a number of years. Some of the new proposed seasonal products, however, will necessitate major variations in the process flow of some departments. The seasonal products are likely to be different every year. The business needs to carefully adapt its business practices so that the significant but seasonal variations in some of the business processes for the new products are handled adequately without disrupting the processes for the other established products.
Which of the following approaches must the BA take to manage the requirements for sales order processing in the long term?

Question400: Which of the following compares two or more systems, states, services, products, or things to determine the best viable choice?

Question401: Which one of the following is the most accurate definition of the solution scope?

Question402: Which of the following reports is generated whenever the project is slipping off the project schedule and includes an of the problem?

Question403: A solution implemented three months ago has decreased performance as the volume of transactions has increased. A business analyst (BA) is tasked with analyzing the performance of the application and providing recommendations.
What actions does the BA need to take?

Question404: What is the increased cost in Scenario 2 for Company C?

Question405: A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.
The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.
The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.
A BA suggests interviewing employees to elicit user requirements and then performing a gap analysis to identify solution customization requirements. However, the sponsor believes that it will be a waste of time because the employees do not know how the process should work in the future. The sponsor expects the solution to help shape their process and wants to start with the solution as is, amending it as necessary based on the user feedback.
What should the BA do?

Question406: The ____, an output of the define scope process, does document the process and criteria for accepting completed products.

Question407: Which of the following reports is generated whenever the project is slipping off the project schedule and includes an explanation of the problem?

Question408: When is stakeholder analysis performed?

Question409: A company finalized the implementation of a new, corporate-wide database. After nearly three months of operation, the solution is repeatedly producing invalid outputs. A business analyst (BA) has been asked to investigate the solution's problem. The BA has been able to find several instances where the outputs from the solution are below an acceptable level of quality.
Which of the following techniques should the BA use to identify the solution limitations?

Question410: You are the business analyst for a large, complex solution and you are working with the stakeholders to determine the prioritization of the requirements. You would like to use the decision analysis to determine the best decision for the requirements outcome. You must know four things as part of decision analysis.
Which one of the following will not help you with this approach to the requirements prioritization process?

Question411: Which stakeholder must approve the business analysis approach to ensure that the business analysis approach is compatible with the other project activities?

Question412: Which of the following is the process of developing a document that formally authorizes a project or a phase?

Question413: A business analyst (BA) wants to estimate the potential value delivered by a set of requirements and design options by targeting a small group of stakeholders to understand their perceived value and expectations. The BA is going to organize a discussion during which feedback is collected.
Which technique will be used?

Question414: Which of the following is a table of all stakeholders showing the mapping of which stakeholders will contribute information to other stakeholders?

Question415: A very large insurer of General Liability and Property Damage insurance has an upward trend of increased claims over the past 5 years.
The Risk Control Area for that company has just completed a 12 month Pilot of a new improved Risk Control Site.
The purpose of the site is to help their customers manage their exposures and ideally prevent them from having claims There were 100 customers that were part of the Pilot that represented 25 different industries. The business goals were to increase use of the site and provide tools to help customer awareness of their exposures, so that they may reduce existing exposures and ultimately reduce claims.
The sites Features were as follows:
* Improvements to the search engine to all customers to search for articles, tools and services on the site
* A checklist function that allow customer to create their own unique Checklists or utilize a sample provided by ABC company to use daily, weekly etc for an area of their facility.
* A promotion feature - where Risk preventing Articles, and tools on the site are marketed toward a customer.
* A profile section allowing for Customer Name, Address and contact Phone number.
Alter the 12 month pilot the business sponsor received an assessment of what was working and what was not. The Assessment of the pilot revealed overall site activity had significantly increased, however only 5% of the time the promotions were viewed. And the most shocking was that total claims increased by nearly 20% for these 100 customers during the pilot period. The business sponsor was perplexed as he had an expectation of reduced claims and at least for 30% viewing of promotions since the project team had spent a lot of careful time and effort on this feature. A BA was assigned to do further analysis regarding the low use of the promotions and why claims were not being reduced.
Regarding the use of promotions the BA looked into other similar companies to see what they did differently to get their customer to look at their promotions. The BA found that similar companies had promotions that targeted the industry the customer was in so it was more relevant to them and they were more interested to view the promotion. In addition the BA sent out a survey to all 100 pilot customers asking probing questions about what they thought of the site and if they felt it had decreased their exposure to risk sufficiently. The Survey responses came back with raving positive comments and providing examples of how the site had been helping in the reduction of claims from the customer's perspective. In addition the survey also revealed insight that the customers found the promotion often irrelevant to their industry.
The BA asked for a dump of all documentation of the 1000 claims that were filed over the 12 month pilot period. The BA found the nearly 90% of the claim filed were all in one region of the country and were all for property damage related to several severe winter storms in the region and the claims were nearly all unavoidable by the customers. The BA brought all this analysis back to the business sponsor and made the recommendation to the business sponsor to require the customer to select 1 of 25 industries in their profile. This would in turn allow for the ability to show industry specific promotions and promote search results relative to a customer's industry to be sorted at the top giving the customer a more personalized experience.
What was the business sponsor looking to validate about the use of promotions?

Question416: A business analyst (BA) was developing an outline of the timing of business analysis activities with the project manager. What factors may impact the timing of the activities the BA is performing?

Question417: You are the business analyst for your organization and are in the process of creating the solution approach for a technology problem. Which one of the following definitions best describes the solution approach?

Question418: is the degree to which a set of inherent characteristics fulfills requirements.

Question419: You are the business analyst for a large, complex solution and you are working with the stakeholders to determine the prioritization of the requirements. You would like to use the decision analysis to determine the best decision for the requirements outcome. You must know four things as part of decision analysis. Which one of the following will not help you with this approach to the requirements prioritization process?

Question420: Several commercial-off-the-shelf (COTS) software packages exist that would enable the business analyst (BA) to meet the needs of the business. For the potential deign options, the Ba included one of the COTS packages as a solution approach What kind of solution approach is this?

Question421: You are the business analyst for your organization. As part of the requirements prioritization you have given each key stakeholder $10,000 in play money to distribute among the identified requirements. Each stakeholder can assign their play money to any of the requirements, but the requirements will be prioritized based on the value of the play money assigned to each requirement. What type of requirements prioritization is happening in this scenario?

Question422: Which of the following represents the duration of activities against a calendar?

Question423: A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.
The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.
The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.
The solution consultants have composed a set of as-is solution documents. A spreadsheet contains a catalog of brief definitions of all requirements with priorities assigned to them. A separate document explains data models and user interfaces. For the new and changed requirements, the BA wants to capture additional attributes such as the source, reason, complexity, and priority of change. Some of these requirements can be reused in other work.
How should information for these requirements be managed?

Question424: Yolanda is the web designer for your company and you are the business analyst. You are working with Yolanda on a new website that your company will host. You'd like for her to create a mock-up of the website without spending much time on the actual workings behind the web interface. You'd like for her to show the customer how the website will look, some idea of the functionality of the website, and some basic graphics and colors so the customer can see the direction of the project.
What type of prototype are you asking Yolanda to create?

Question425: Which one of the following business analysis planning and monitoring techniques can be used to define and document the business analysis approach?

Question426: You are the business analyst for your organization and you are completing the manage requirements traceability process. You are tracking the requirements to determine how the requirements are interrelated with one another and with the actual delivery of the project scope.
There are actually three reasons why the business analyst should trace requirements. Which one of the following is not one of the three reasons why trace requirements is useful?

Question427: You need to identify assumptions as part of the assessment of capability gaps. Which of the following is an example of an assumption?

Question428: Which of the following processes can start with the source of problems or with the problem itself?

Question429: A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.
The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.
The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.
The solution consultants have composed a set of as-is solution documents. A spreadsheet contains a catalog of brief definitions of all requirements with priorities assigned to them. A separate document explains data models and user interfaces. For the new and changed requirements, the BA wants to capture additional attributes such as the source, reason, complexity, and priority of change. Some of these requirements can be reused in other work.
How should information for these requirements be managed?

Question430: A corporation is experiencing poor financial performance and needs to change many aspects of its business strategy in order to become solvent again. A business analyst (BA) is conducting a feasibility analysis and analyzing resources required. The BA has identified the existing resources, the resources that need to be increased, and the required additional capabilities. What is the other dimension this analysis should indicate?

Question431: A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:
Ability to integrate online maps and global positioning system (GPS) technology with the mobile application in real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.
II. Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.
III. Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.
Through requirements workshops the business analyst elicits the following detailed business requirements:
1. The company's mobile application platform must support real time integration with the following third party systems:
A ) GPS System
B ) Postal Code Validation
2. The service providers available for selection must participate in the subscriber's medical plan network as of the current system date.
3. The map display shall highlight the boundary of the search area with a dotted yellow line.
4. The extent and shape of the search area shall be determined based on one of the following user choices:
A ) Postal code - Subscriber location acquired from GPS shall be used to determine and populate the related postal code as the default postal code with options for the user to change the postal code.
B ) Radius for the search area around the subscriber's location, that will have default value of 5 miles. The radius can be changed by the subscriber with a maximum range of 50 miles.
5. Subscriber shall be able to select one of the options above and supply corresponding input.
6. System shall validate the user input and display appropriate error messages if invalid.
7. Based on the inputs and the plan of the subscriber, the system shall retrieve information for the participating service providers that are located within the designated search area.
8. System shall display a map including visual markers to indicate locations of the service providers in the top half of the device screen and a list of the same service providers in the bottom half of the device screen.
9. The list of service providers shall include the Name, Phone Number and Street Address.
10. If the subscriber specified the radius or retained the default postal code for the search area, the list shall additionally include the approximate driving distance in miles from the subscriber's last registered location and the list shall be sorted in the ascending order of the driving distance.
11. The subscriber shall be able to select a service provider either from the list or from the map and download a document that contains the name, contact telephone, email address, fax number and the fee schedule for the covered services applicable to the subscriber's plan.
Which of the following characteristics is violated by requirement 5?

Question432: What does the T in SWOT analysis mean?

Question433: A business analyst (BA) finds that the solution service level agreement (SLA) cannot be met m one out of five identified scenarios. is there 4 a dependency on a requirement which is a part of a future release. How should the BA approach the solution limitation?

Question434: The project manager wants to have the requirements analysis phase approved and asks the business analyst (BA) if this is possible. The BA wants to ensure that the requirements package is complete prior to closing the analysis phase. What would help the BA expedite the approval process for the analysis phase?

Question435: An organization implements a solution to increase the efficiency of its internal processes. The business analyst (BA) felt that the success of the solution is tied to the organizational structure and confirmed that the solution conforms to the organizational hierarchy. After the solution rolled out, the solution was not widely adopted among stakeholders and some features were not being utilized.
Which aspect of the organizational structure did the BA fail to consider?

Question436: You are the business analyst for your organization. For the past several months you have been completing the business analysis duties for the solution stakeholders. You now have, you believe, the solution requirements identified and documented. What must you now do with the requirements before proceeding?

Question437: You are the business analyst for your organization. Management realizes that a proposed solution has risks that may cause the entire project to fail. They would like you to prioritize the requirements with maximum risks first so that if the project fails, there is little loss of capital in the project implementation. What requirements prioritization approach is management asking you to create in this instance?

Question438: You are the business analyst for your organization and are working with Ralph who is also a business analyst at your company. You have moved one of the requirements higher in the prioritization of the requirements because it is needed to be implemented before some of the more important requirements are done. Ralph disagrees with your placement of the requirement because you are to rank the requirements based on their level of difficulty. Who is correct and why?

Question439: You are the business analyst for your organization. Management has asked that in the business case you're creating that you also include the projected costs and benefits to be realized and how those and benefits will be assessed and evaluated. What term matches management's request?

Question440: Which of the following is a narrative description of the work required for the project?

Question441: Which of the following is the process of defining and analyzing the dangers to individuals, businesses, and government agencies posed by potential natural and human-caused adverse events?

Question442: A business analyst (BA) is preparing for observation. A passive approach has been selected for establishing performance metrics. What should be identic for the next step?

Question443: A business analyst (BA) is eliciting requirements to automate existing manual processes for fulfilling end users service requests. There is pressure from management to automate the process quickly using a commercial off-the-shelf (COTS) tool. The COTS solution has various modules including one for service request automation that has yet to be implemented in the organization. What e the BA's first step?

Question444: Which of the following is the best definition of the business rules analysis?

Question445: Mark is the business analyst for his organization. He is working with the solution development team and he believes that the team does not want to implement a certain portion of the requirements. The team is expressing the difficulty of the requirements and how it will be extremely challenging to complete. When Mark asks about a similar project that the team completed, they insist that this is a different type of requirements though Mark believes that it is not. What is the solution development team appearing to do to the requirements?

Question446: Which one of the following terms is not a business analysis planning and monitoring approach?

Question447: You are the business analyst for your organization and are working on prioritizing requirements.
What plan should guide you through this process?

Question448: Jenni is the business analyst for the UHQ Organization. She is preparing to complete the conduct elicitation activity for her organization.
Jenni can use all of the following techniques as part of this activity except for which one?

Question449: ____ is a process to determine the completeness of the project work and to gain the customer's acceptance to move the project forward.

Question450: You are the business analyst for a large project for your organization. Your project has 65 stakeholders and this will greatly increase the complexity of the communication in this project. To demonstrate how complex this project and its communication will be, you show the management the number of communication channels in this project. How many channels exist in this project based on the number of stakeholders?

Question451: Which of the following is responsible for preparing the business architecture, feasibility studies, and business cases?

Question452: Which of the following is derived from a schedule model to meet the project execution plan and achieve management approval for use as a baseline?

Question453: Mark is the business analyst for his organization. Mark and his business analysis team have used the whiteboard to record the documentation as the result of requirements elicitation. What must be done with this information if Mark uses a whiteboard?

Question454: Which of the following charts is a quality control tool to show categories of defects?

Question455: Which of the following is an estimate based on past projects to predict the current cost and/or duration of the current project?

Question456: Which of the following is a quality control chart to track trends in project execution?

Question457: You are the business analyst for your organization. On your current project you'll be using the change-driven approach for defining requirements and gathering feedback. Which of the following statements best describes the change-driven approach?

Question458: A business analyst (BA) in a large financial institution, responsible for the management of requirements, has completed all the activities related to tracing requirements and is now pursuing to maintain them. The BA has identified a large number of requirements which have long term reuse and is now looking for guidance to manage these requirements.
Which of the following will indicate how requirements will be managed for reuse?

Question459: Which of the following is concerned with determining whether the information used for risk analysis is probable, of high class, or accurate?

Question460: You are the business analyst for your organization and you are preparing to elicit the requirements for a new business opportunity. Which one of the following statements best describes the prepare for elicitation process?

Question461: Which of the following communicates from the program-level perspective - a clear understanding and statement of the technical objectives and the end products, services, or results of the work to be performed?

Question462: Which of the following processes measures the maturity level of the security program?

Question463: A business analyst (BA) is preparing for observation. A passive approach has been selected for establishing performance metrics.
What should be identified for the next step?

Question464: Which of the following compares two or more systems, states, services, products, or things to determine the best viable choice?

Question465: Which conduct stakeholder analysis technique identifies stakeholder roles that may serve as a useful starting point for identifying actors and roles?

Question466: A utility company found that its current billing system charges customers for their usage, but does so incorrectly when the system estimates reads on meters rather than performs actual reads. Company stakeholders would like to improve this aspect of the system but are hesitant to make changes because they are otherwise pleased with the system. A business analyst (BA) has completed a current state diagram and would like to start discussions on what the future state may look like. What information can the BA determine by having a current state diagram?

Question467: Martha is observing Sarah complete several complex steps as part of her business analysis requirements elicitation process. In this instance Martha working alongside Sarah is actually helping Sarah complete the work so that Martha can understand all of the steps Sarah must complete.
What type of requirements elicitation technique is Martha using?

Question468: Which of the following is the formal acceptance of the project?

Question469: A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:
I . Ability to integrate online maps and global positioning system (GPS) technology with the mobile application in real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.
II . Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.
III . Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.
Through requirements workshops the business analyst elicits the following detailed business requirements:
1. The company's mobile application platform must support real time integration with the following third party systems:
A ) GPS System
B ) Postal Code Validation
2. The service providers available for selection must participate in the subscriber's medical plan network as of the current system date.
3. The map display shall highlight the boundary of the search area with a dotted yellow line.
4. The extent and shape of the search area shall be determined based on one of the following user choices:
A ) Postal code - Subscriber location acquired from GPS shall be used to determine and populate the related postal code as the default postal code with options for the user to change the postal code.
B ) Radius for the search area around the subscriber's location, that will have default value of 5 miles. The radius can be changed by the subscriber with a maximum range of 50 miles.
5. Subscriber shall be able to select one of the options above and supply corresponding input.
6. System shall validate the user input and display appropriate error messages if invalid.
7. Based on the inputs and the plan of the subscriber, the system shall retrieve information for the participating service providers that are located within the designated search area.
8. System shall display a map including visual markers to indicate locations of the service providers in the top half of the device screen and a list of the same service providers in the bottom half of the device screen.
9. The list of service providers shall include the Name, Phone Number and Street Address.
10. If the subscriber specified the radius or retained the default postal code for the search area, the list shall additionally include the approximate driving distance in miles from the subscriber's last registered location and the list shall be sorted in the ascending order of the driving distance.
11. The subscriber shall be able to select a service provider either from the list or from the map and download a document that contains the name, contact telephone, email address, fax number and the fee schedule for the covered services applicable to the subscriber's plan.
Which primary subscriber business need is addressed with the enhancements?

Question470: Which of the following describes the actual users who interact with one another, a system, or data moved between two users?

Question471: What element of the plan business analysis process affects the business analysis duties that need to be performed?

Question472: A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.
The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.
A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

Preparing a customer order for loading takes about one hour. Upon the BA's observation, only 30% of trips have their orders available for loading when a truck arrives. This causes a waste of both the truck's and the driver's time.
What should the BA recommend to eliminate such waste?

Question473: Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.
The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

While verifying the requirements, the BA notices that Requirement ID NFO0003 does not meet the
"unambiguous" or the "testable" characteristics of requirements quality. The BA plans to re-write the requirement.
Which of the following requirements is both unambiguous and testable?

Question474: Which of the following can be used in root cause analysis?

Question475: Which of the following defines the deliverable the customer is expecting?

Question476: Your organization completes software development for other companies as its core business.
Management would like to streamline the requirements gathering processes as many of the projects your company do are similar in nature.
What approach could you as a business analyst do to help streamline the requirements gathering process for your organization?

Question477: Which of the following process groups occurs at the beginning of the project?

Question478: Your organization uses the MoSCoW approach to requirements prioritization. What does MoSCoW mean?

Question479: Which of the following roles approves the project scope statement, phase gate reviews, solution validations, scope changes, and project success criteria?

Question480: Which of the following tasks does not rely on other activities, and no other activities rely on this task completing?

Question481: The business analysis approach generally defines all of the following attributes except for which one?

Question482: You are creating the solution scope for an identified problem in your organization. You are working with several stakeholders during this process including the domain subject matter expert, the implementation subject matter expert, the project manager, and the sponsor.
Which of these stakeholders will be responsible for writing the project scope?

Question483: You are the business analyst for your organization. Management realizes that a proposed solution has risks that may cause the entire project to fail. They would like you to prioritize the requirements with maximum risks first so that if the project fails, there is little loss of capital in the project implementation.
What requirements prioritization approach is management asking you to create in this instance?

Question484: As a milestone is reached, the project is funded for enough capital to reach the next milestone. This approach is called.

Question485: While working on a major project to replace the billing mechanism at a bank, a major change in scope is discussed. Which approach does the business analyst (BA) use to help determine the formality of the assessment process to be followed to understand the impacts of the scope change?

Question486: The objective of a solution implemented was to increase the number of customer calls resolved per hour.
When using basic statistical sampling concepts, what does the business analyst (BA) need to consider?

Question487: Which of the following process groups occurs at the beginning of the project?

Question488: Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.
The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

The BA will create a Data Model to meet which requirement?

Question489: The business analyst (BA) is not having great success scheduling stakeholder meetings. Stakeholders say they are too busy or there are higher priority meetings on their calendars. The BA is concerned, knowing that stakeholder availability, attitude, and willingness to engage will impact the timeliness of project delivery as well as the __________.

Question490: You are the business analyst for your organization and are planning the business analysis approach. One of the techniques you are considering for this undertaking is to rate the available methodologies against the organizational needs and objectives.
Which of the following terms describes the business analysis technique that you are currently considering in this scenario?

Question491: You are the business analyst for your organization and are creating the solution scope definition.
Which of the following should be included in the solution scope definition?

Question492: You are the business analyst for a large project for your organization. Your project has 65 stakeholders and this will greatly increase the complexity of the communication in this project. To demonstrate how complex this project and its communication will be, you show the management the number of communication channels in this project. How many channels exist in this project based on the number of stakeholders?